My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-03_REVISION - M1980146
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980146
>
2009-08-03_REVISION - M1980146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:13 PM
Creation date
8/4/2009 8:35:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980146
IBM Index Class Name
REVISION
Doc Date
8/3/2009
Doc Name
Conditions for approval
From
DWR
To
DRMS
Type & Sequence
AM4
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QCo <br />DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES V AM_oy <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Response to Reclamation Permit Application Consideration Dick Wolfe, P.E. <br />Director/State Engineer <br />DATE: July 16, 2009 <br />TO: Bob A. Oswald, Environmental Protection Specialist <br />CC: Division 7 Office; District 30 Water Commissioner <br />FROM: Melissa A. Peterson, P.E. <br />RE: Montoya Pit, File No. M-1980-146 <br />Operator: C & J Gravel Products Inc., Contact: Jack <br />Gilleland, C & J Gravel Products Inc., (970) 385-4112 <br />Section 10, Twp 34N, Rng 9 W, N.M. P.M., La Plata County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />? The proposed operation will consume ground water by: ? evaporation, ? dust control, ? <br />reclamation, ? water removed in the mined product, ? processing, ? other: . <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />? Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />? Other: <br />COMMENTS: If stormwater is contained on-site, it must infiltrate into the ground or be released to the <br />natural stream system within 72 hours, or all work must cease until a substitute water supply plan, or <br />augmentation plan approved by water court, is obtained. Reclamation plans must ensure water will <br />not be retained onsite for more than 72 hours unless an augmentation plan approved by water court <br />is obtained. <br />CRr`.i RC??P 1/1 U1 P <br />AUG 0 3 2€0,9 <br />Division or <br />Mining and Safety <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303-866-3581 • Fax: 303-866-3589 <br />www.watenstatexo.us
The URL can be used to link to this page
Your browser does not support the video tag.