My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-27_REPORT - M2007044
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2007044
>
2009-07-27_REPORT - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:08 PM
Creation date
8/3/2009 1:45:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
REPORT
Doc Date
7/27/2009
Doc Name
June 2009 Discharge Monitoring Report
From
Energy Fuels Resources Corporation
To
Water Quality Control Division
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
stipulations. No stormwater flow has been observed in the middle tributary of Lumsden <br />Creek at the treatment plant or from Lumsden Creek into the Dolores River during <br />periods of treated water discharge. As a result, no water samples have been collected <br />from Dolores River. Energy Fuels will continue to monitor surface water flow at these <br />locations and collect samples as required. <br />The table below shows the current schedule and status for environmental compliance <br />sampling. <br />Sampling Point Schedule Status <br />Whirlwind Decline Sample for 2 quarters and Completed; four samples and six <br />(Sump) measure flow for 4 quarters flow/field parameter <br /> measurements collected <br />PR Spring Sample & measure flow Baseline sampling complete; six <br /> quarterly for 5 quarters quarterly samples and flow/field <br /> Measure flow quarterly and parameter measurements <br /> sample annually thereafter collected to date <br />DP Spring Measure flow quarterly Six flow/field parameter <br /> measurements recorded to date <br />Monitoring Well W-1 8 samples over 15 months/ Five of eight baseline samples <br /> Measure quarterly and collected to date <br /> sample annually thereafter <br />Packrat Mine Water Sample for 2 quarters when Not started; the Packrat Mine is <br /> accessible not et accessible <br />Treatment Plant Sample weekly during Ongoing sampling requirement <br />Discharge discharge during discharge events <br />Dolores River Sample during treatment Ongoing monitoring; no samples <br />Sampling discharge if flowing into collected to date <br /> Dolores River <br />Sediment Pond Sample quarterly if Ongoing monitoring; no samples <br />Sampling discharging collected to date <br />Lumsden Canyon and As needed in support of Two samples collected from 3 <br />other springs/seeps Hydrogeological Report to points in Lumsden Canyon and <br /> be prepared by Western no additional springs/seeps <br /> Water & Land located. No further sampling <br /> events are scheduled at this time. <br />As indicated in the table above, the sampling requirements outlined in correspondence <br />with DRMS and the BLM stipulations have been satisfied for the Whirlwind Decline. <br />Energy Fuels plans to continue flow and field parameter measurements on a quarterly <br />basis.
The URL can be used to link to this page
Your browser does not support the video tag.