My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 8/3/2009, 1:08:21 PM-MR1
DRMS
>
Public
>
PERMIT FILE - 8/3/2009, 1:08:21 PM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:41 PM
Creation date
8/3/2009 1:15:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009024
IBM Index Class Name
PERMIT FILE
Doc Date
8/3/2009
Doc Name
New NOI application
From
Shell Frontier Oil & Gas Inc.
To
DRSM
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br />6.E. No chemicals will be stored on site. It may be necessary to store fuel on <br />site, if that is the case it will be contained in a double-walled tank, drip pans and <br />containment will be used during re-fueling. The rig will require the use of engine <br />oil, hydraulic oil, and lubricants, however these will be stored on the rig while the <br />rig is on site. A fuel truck will be temporarily located at the drill pad during drilling <br />operations to provide fuel to the drill rigs. The rig may require use of Rock Drill Oil <br />(RDO 302 ES) during drilling. The Rock Oil is vegetable oil based and does not <br />contain any hazardous or controlled products. A foaming agent may be required to <br />remove cuttings from the holes. In addition, a de-foaming agent may be required <br />to minimize foaming in the pits. <br />CONTINUED FROM PAGES 5 & 6 OF NOI FORM <br />IV Operation and Reclamation Measures <br />2. All of the pads covered under this NOI are located within sagebrush parks <br />and pinyon/juniper woodlands. The upland sagebrush is fairly uniform across most <br />of the pads. <br />4. All holes will be plugged to surface using inert fill and cement plugs to <br />isolate the water bearing zones. All material and plugging methods will conform <br />to Rule 5.4 of the Hard Rock/Metal Mining Rules and Regulations, and to any <br />additional standards imposed by the Bureau of Land Management, county, and <br />local ordinances or regulations.
The URL can be used to link to this page
Your browser does not support the video tag.