My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-15_PERMIT FILE - C1981010 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2009-06-15_PERMIT FILE - C1981010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:43 PM
Creation date
7/31/2009 10:11:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
6/15/2009
Section_Exhibit Name
Appendix W 2008 Report Section 3.0 to 7.0
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• SECTION 5.0 Topsoil Stockpile Locations <br />Trapper's approved permit (Section 4.9.2) specifies that CDRMS will be provided with map(s) <br />illustrating the location of topsoil stockpiles constructed during the previous year and the approximate <br />locations for stockpiles proposed for construction during the upcoming year (Map 1). <br />Table 5-1 lists all existing stockpiles with their identification nomenclature, coordinates (based on the <br />approximate center of the pile), acres, construction date and volume; which is updated annually. <br />During 2008, Trapper constructed four new stockpiles labeled G102, K108, Z108, and A108. <br />Additionally six existing piles; A011, G202, Z107, ZTS1, ZTS2, and G406 were totally depleted for <br />topsoil replacement or relocation. Topsoil pile AET1 and F206 was partially removed during stripping <br />activities in Flintlock and Ashmore Pit. <br />At the end of 2008, excluding stockpiles abandoned with the approvals of MR-155 and TR-94, there are <br />70 existing topsoil stockpiles at Trapper affecting 179.7 acres and storing approximately 3,862,313 <br />cubic yards of salvaged topsoil. <br />The proposed approximate locations for topsoil stockpiles in 2009 may exceed the actual number that <br />will be constructed. Proposed topsoil stockpiles and the number of piles constructed are dependent <br />upon the field conditions that are encountered each reclamation season. Additionally, particular piles <br />may be depleted from or added to in order to maintain a cost effective salvage or replacement program <br />during a particular year. <br />• [DR 5/09 <br />[ORMS108TSte)QS-0) <br />•
The URL can be used to link to this page
Your browser does not support the video tag.