Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br /> OFFICE OF SURFACE MINING <br /> Mine Site Evaluation State Program <br /> Permittee/ Permit Field Visit <br /> Person SNOWCAP COAL CO Number C-041-81 Date 07/10/2069 Continuation Page <br /> 28. Performance Standard Categories <br /> Codes: 1=Compliance,2=Noncompliance,3=Not Planned,4=Not Started,S=Noncompliance Identified Elsewhere,6=Previously Cited <br /> A. Administrative D. Backfilling&Grading H. Subsidence Control Plan <br /> 1._Mining within Valid Permit 1. Exposed Openings - <br /> 2._Mining within Bonded Area 2,_Contem oraneous Reclamation I. Roads <br /> 3._Terms&Conditions of Permit p 1.-Road Construction <br /> 3._Approximate Original Contour 2, Certification <br /> 4._Liability Insurance 4._ Slopes Highwall Elimination 3. Drainage <br /> 5._Ownership and Control 5._Steepincludes downslo e - <br /> pes( P ) 4. Surfacing and Maintenance <br /> 6._Temporary Cessation 6. Handling of Acid&Toxic Materials 5._Reclamation <br /> 7._AML Rec.Fees--Non-Respondent 7._Stabilization(rills and gullies) J. Signs&Markers <br /> 8._AML Rec.Fees--Failure to Pay E. Excess Spoil Disposal L_Signs <br /> B. Hydrologic Balance 1._Placement <br /> 1.- <br /> Drainage Control 2. Drainage Control 2._Markers <br /> 2.- <br /> Inspections&Certifications 3._Surface Stabilization K. -Distance Prohibitions <br /> 3.- <br /> Siltation Structures 4. Inspections&Certifications L. 1.. 1 e Vegetative Cover <br /> 4.- <br /> Discharge Structures F. Coal Mine Waste _ <br /> 5.- <br /> Diversions (Refuse Piles/Impoundments) �' 1 Timing6. Effluent Limits 1. Drainage Control M. 1 Postmining Land Use <br /> 7. Ground Water Monitoring 2. Surface Stabilization N. Other <br /> 8. Surface Water Monitoring 3._Placement General <br /> 9. Drainage--Acid-Toxic Materials 4.- <br /> Inspections and Certifications Performance <br /> 10. Impoundments 5.- <br /> Impounding Structures Catagory <br /> 11. Stream Buffer Zones G. Use Of Explosives - 1) <br /> C. Topsoil&Subsoil 1.- <br /> Blaster Certification - <br /> 1._Removal 2.- <br /> Distance Prohibitions _2) <br /> 2. Substitute Materials 3.- <br /> Blast Survey/Schedule - <br /> 3._Storage and Protection 4.-Warnings&Records -3) <br /> 4. Redistribution 5. Control of Adverse Effects - <br /> Performance Standard Catagories E. Excess Spoil Disposal...........................................(816/817.71-74) <br /> 30 CFR Counterpart 1. Placement...........................................................................................71(e) <br /> A. Administrative......................................................................... 2. Drainage Control:...............................................................................71(f) <br /> I. Valid Permit....................................................................................773.11 3. Surface Stabilization...........................................................................71(g) <br /> 2. Mining within Bonded Area................................................773.11 4. Inspections&Certifications...............................................................71(h) <br /> 3. Terms&Conditions of Permit.............................................773.17 F. Coal Mine Waste(Refuse Piles/Impoundments) .....(816/817.81-84) <br /> 4. Liability Insurance................................................................800.60 <br /> 5. Ownership and Control.......................................... .........778.13 1. Drainage Control...............................................................................83(a) <br /> 6. Temporary Cessation..............................842.11(e)&816/817.131 2. Surface Stabilization.......................................................................... 3(b) <br /> 7. AML Rec.Fees--Non-Respondant................................870.15(b) 3. Placement...........................................................................................83(c) <br /> 8. AML Rec.Fees--Failure to Pay.....................................870.15(a) 4. Inspections and Certifications...........................................................83(d) <br /> B. Hydrologic Balance......................................(816/817.41- ) 5. Impounding Structures...........................................................................84 <br /> 57G. Use of Explosives..................................................(816/817.61-68) <br /> 1. Drainage Control.........................................................................45 <br /> 2. Inspections&Certifications.............................................49(a)(10) 1. Blaster Certification...........................................................................61(c) <br /> 3. Siltation Structures......................................................................46 2. Distance Prohibitions.........................................................................61(d) <br /> 4, Discharge Structures...................................................................47 3. Blast Survey/Schedule.......................................................................62-64 <br /> 5. Diversions...................................................................................43 4. Warnings&Records......................................................................66&68 <br /> 6. Effluent Limits............................................................................42 5. Control of Adverse Effects.....................................................................67 <br /> 7. Ground Water Monitoring......................................................41(c) H. Subsidence Control Plan.........................................(817.121-122) <br /> 8. Surface Water Monitoring......................................................41(e) 1. Roads.................................................................(816/817.150-151) <br /> 9. Drainage--Acid-Toxic Materials...........................................41(f) <br /> 10. Impoundments............................................................................49 1. Road Construction........................................................................... 151(a <br /> Certifi <br /> 11. Stream Buffer Zones...................................................................57 2. Drainage <br /> d) <br /> 3. Drainage...............................................................................150(b)-151(d) <br /> C. Topsoil&Subsoil...............................................(816/817.22) 4. Surfacing and Maintenance..................................................150(e)-151(d) <br /> 1. Removal..................................................................................22(a) 5. Reclamation......................................................................................150(f) <br /> 2. Substitute Materials.................................................................22(c) J. Signs&Markers.......................................................(816/817.11) <br /> 3. Storage and Protection..:..........................................................22(c) <br /> 4. Redistribution........................................................ ........22(d) 1. Signs.....................................................................................1 1(a),(b),&(c) <br /> 2. Markers......................................................................I I(a),(b),(d),(e),&(fl <br /> D. Backfilling&Grading..............................(816/817.95-107) K. Distance Prohibitions.......................................................(761.11) <br /> 1. Exposed Openings.....................816/817.13, 14, 15,&823.11 &21 L Revegetation.....................................................(816/817.111-116) <br /> 2. Contemporaneous Reclamation..................................................100 <br /> 3. Approximate Original Contour..........................................102(a)(1) 1. Vegetative Cover.......................................................................III &116 <br /> 4. Highwall Elimination.........................................................102(a)(2) 2. Timing..................................................................................................113 <br /> 5. Steep Slopes(includes downslope)............................................107 M. . Postmining Land Use..............................................(816/817.133) <br /> 6. Handling of Acid&Toxic Materials......................................102(c) <br /> 7. Stabilization(rills and gullies)..................................................95(b) RevisedDecember4,1998 Page 2 of ;2 <br />