Laserfiche WebLink
S <br /> backfilled, regraded, stabilized, drainage channels have been established, and revegetation has <br /> been successful. Some maintenance issues will need to be addressed before bond may be release <br /> on these areas. These are: removing metal waste from sediment basin, weed control and, <br /> potentially, maintenance on the south road drainage channel. Mr. Musick will provide Mr. Leech <br /> with a PDF map indicating where maintenance/weed control is necessary. I believe the <br /> vegetation data provided in the BR application accurately represents the successful revegetation <br /> efforts on this site. <br /> Photographs taken: <br /> RX <br /> r ` <br /> im �3 <br /> x gyp �p Ada _ Pz I <br /> Figures I &2: Metal waste found in sediment trap <br /> r <br /> Figure 3: Moffat view from NE corner <br />