Laserfiche WebLink
Reclamation Success <br /> SL-10— In terms of meeting the criteria for Phase I, II and III bond release, the reclaimed areas at the <br /> Edna Mine were acceptable with the exception of the above mentioned maintenance and repair <br /> issues. Reclamation, in terms of backfilling, grading, and revegetation success, was great at the time <br /> of the inspection. <br /> SL-11 —The overall condition of the Phase I I and II I bond release reclamation was good. The <br /> reclamation areas showed good vegetation cover with no excessive invasive or noxious vegetation <br /> within the parcels. Other than the noted weed management issues noted above, the reclamation <br /> areas had no major problems with damage or erosion at the time of the inspection. <br /> Based on the inspection, SL-10 and SL-11 will require the above referenced maintenance issues to <br /> be address before a proposed decision can be made. <br />