My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1980001 (26)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980001
>
_INSPECTION - C1980001 (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2020 6:39:39 AM
Creation date
7/30/2009 2:44:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
7/20/2009
Email Name
JDM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> This was a partial coal inspection conducted by Jason Musick of the Colorado Division of <br /> Reclamation, Mining, and Safety(Division) on 20 July 2009. The purpose of this inspection was to <br /> evaluate the on-the-ground condition with respect to Edna Mine's Phase I, II, and III (SL-10) and <br /> Phase II and III (SL-11) bond release applications, in accordance with Rule 3.03.2(2). The inspection <br /> was attended by the following: <br /> Janet Binns of CDRMS <br /> Christine Belka of OSM <br /> Steven Leach of Chevron Mining (operator) <br /> Troy Summers of WWC Engineering (operator consultant) <br /> Lori Jazwick of NRCS <br /> Sarah Hagenbach of NRCS <br /> Tom and Leslie Maneotis (landowner) <br /> Rob and Kathryn Dick (landowner) <br /> Scott Hayden (representing landowners) <br /> It is noted that Lori Jazwick, Sarah Hagenbach, and Rob and Kathryn Dick left the bond release <br /> inspection at the conclusion of the SL-10 portion of the inspection. <br /> The weather was clear and the ground was dry during the on-the-ground inspection of the site for the <br /> morning with raining and wet conditions in the afternoon. All areas to be inspected were accessible <br /> and visible. <br /> Lands requested for liability release under SL-10 include 13.3 acres of land reclaimed in 2003. Lands <br /> requested for liability release under SL-11 include 1197.6 acres of land reclaimed during '1981 <br /> through 1996. Surface land ownership is private and Federal. Sub-surface ownership is both Federal <br /> and private. Representatives from the Office of Surface Mining and the Bureau of Land Management <br /> were notified with OSM accompanying the inspection and BLM declining to attend. <br /> Hydrologic Balance <br /> The reclaimed Tipple Ponds and the permanent sediment trap configuration along the lower tipple <br /> road of SL-10 were inspected and found to be in good condition. No evidence of erosion features or <br /> damage was noted in the drainage. The sediment trap configuration included some random pieces of <br /> steel pipe within the trap that will need to be removed prior to the release of SL-10. <br />
The URL can be used to link to this page
Your browser does not support the video tag.