Laserfiche WebLink
BTU EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE I.D. NO. 1211 -CO-09-013 70-01 (SURFACE WASTE PILE) <br />PILE I.D. NO. 1211-CO-09-01370-02 (OLD NO. 9 EXCAVATION) <br />DATE/TIME: & Lof'f <br />INSPECTOR SIGNATURE:, <br />INSPECTOR TITLE: C-1 o rp n /! r erg ?a Sif1?' (? ?/ ! <br />Under the supervision of Michael W. Ludlow, Colorado P.E. #24046 <br />This inspection was conducted to comply with DMG Rule 4.09.1(11). <br />This inspection was conducted to evaluate: <br />_? Stability of fill (quarterly inspection) <br />B. Critical construction periods: <br />1. Removal of all organic material/topsoil <br />2. Placement of underdrainage system <br />3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />5. Revegetation <br />NOTES: <br />CivGl 5>? <br />.=? <br />file: I:\EN\EN VIRONMENTAL\EMPIRE\INSPREP\WASTEPILEFORM.DOC