Laserfiche WebLink
7/24/20099:24 AM2'nd Qtr DMR_09] <br />2'nd QUARTER 2009 <br />Work Area Pond <br />NOTES <br />OUTFALL <br />ID DISCHARGE <br />START DISCHARGE <br />END SAMPLE <br />DATE FIELD <br />PH <br />LAB PH <br />TSS <br />SS <br />FE FLOW <br />(MGD) <br />TDS OIL/ <br />GREASE FIELD <br />eC <br />002A 04/08/09 04/08/09 04/08/09 8.56 8.50 8 <0.02 0.28 0.180 1980 none 3192 <br />002A 05/04/09 05/04/09 05/04/09 8.67 8.30 <5 <0.02 0.11 0.006 1860 none 2951 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Minimum 8.56 8.30 <5 <.2 0.11 0.006 1860 none 2951 <br /> Maximum 8.67 8.50 8.00 <.2 0.28 0.180 1980 none 3192 <br />Flume size - 9" Monthly Apr <br />Average May <br />Jun <br />Report minimum for the quarter - pH <br />Report maximum for the quarter - pH,Fe,TDS,TSS,SS,Flow <br />Report maximum highest 30 day average - Fe,TSS,Flow <br />Report the total number of samples taken <br />Sample for Fe,TDS,TSS,SS,Flow at least once/month if discharging continuously <br />Sample for pH,flow, visual oil & grease if discharging continuously once/week <br />CF 21.1.2 2009 <br />DMR DISCHARGE DATA <br />8 <.2 0.28 0.180 1980 <br /><5 <.2 0.11 0.006 1860 <br />NA NA NA NA NA <br />1'st Qtr DMR_08.xis <br />Page 2