Laserfiche WebLink
RECLAMATION COST <br /> RECLAMATION CONSTRUCTION QTY UNIT COST COST <br />1 Back fill pit area to a 3:1 slope 1.57 acre 0.15 / cyd 5092.50 <br /> (34,000 cyd) <br />2 Grass seed mix 4.84 acre 191.00 / acre 924.44 <br />3 Fertilizer N & P 4.84 acre 12.00 / acre 58.08 <br />4 Topsoiling - Dozer 4.84 acre 200.00 / acre 968.00 <br />5 Seedbed Preperation and planting 4.84 acre 160.00 / acre 774.40 <br />6 Mulching (Hay or Straw) 4.84 acre 600.00 / acre 2904.00 <br />7 Weed Control 4.84 acre 50.00 / acre 242.00 <br />8 Mobilization & Demobilization 2 pc. 350.00 ea 700.00 <br /> Total Cost 11663.42 <br /> Cost / Acre 2409.79