My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-27_INSPECTION - M1994117
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1994117
>
2009-07-27_INSPECTION - M1994117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:07 PM
Creation date
7/28/2009 8:49:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
INSPECTION
Doc Date
7/27/2009
Doc Name
Comments
From
Mount Royale Ventures, LLC
To
DRMS
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4: <br />Mount Royale Ventures, LLC <br />Post Office Box 19754 <br />Boulder, CO 80308 <br />Telephone: 720 565-3448 <br />Fax: 720565-3497 <br />July 23, 2009 <br />/Mr. Allen Sorenson <br />Environmental Protection Specialist <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br /> <br />RECEIVED <br />,,/JUL 2 7 2009 <br />Diviso, or i,,eciarpatign, <br />Mining ild Safety <br />Denver, CO 80203 <br />RE: M1981-141, M1994-117: Inspection Reports - Dated 5/6/09, <br />6/12/09 <br />Dear Mr. Sorenson, <br />Mount Royale Ventures, LLC (MRV) is in receipt of four (4) inspection reports <br />from the Division. These are: <br />M1983-141 - Dated 5-6-09, in response to Steen complaint. Three (3) possible <br />problems identified. <br />M1994-117 - Dated 5-6-09, in response to Steen complaint. No problems <br />identified. <br />M1983-141 - Dated 6-12-09, monitoring inspection. Two (2) possible problems <br />identified. <br />M1994-117 - Dated 6-12-09, monitoring inspection. Four (4) possible problems <br />identified. <br />All of these forms were signed by you on 6-25-09 or 6-26-09. <br />These documents were received by MRV on or about 7-01-09 at the Post Office <br />Box listed above. <br />Due to the context of the Steen complaint(s) and the serious nature of the <br />allegations, as well as the fact that little to no activity is currently occurring at the <br />site(s), MRV must be measured and thorough with a response to each of these <br />issues. <br />Please expect a forthcoming detailed response to each and every issue raised in <br />these reports. MRV may need to consult a number of former employees, <br />contractors and consultants, along with our attorney(s). The time necessary for <br />this will be substantial however, MRV commits to providing a response within <br />sixty (60) days of the receipt of the reports.
The URL can be used to link to this page
Your browser does not support the video tag.