Laserfiche WebLink
Project: <br />• ' GEOTECH Client / On Site Rep: <br />Bowie Resources / B. Bear <br />Bowie Mine Gob Pile Stability _.....:::?...._.:..?_m_-._._... <br />Civil, Structural & Geotechnical Engineers <br />222 South Park Ave. • Montrose <br />CC 81401 Contractor / Rep: <br /> <br />Load Out Services / Ty Hyatt <br />Project No: <br />2005126-CMT Date: <br />4/23/2009 , <br />Ph.: (970) 249-6828 • FAX: (970) 249.0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />L. Sanchez <br />DAILY COMPACTIO N REPORT <br /> LOCATION TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB SAMPLE <br />TEST <br />NUMBER Embankment Gob - Gob Pile No. 2 <br />Center Slope GRADE ELEV <br />NUC <br />SAND DENSITY <br />(Pcf) MOISTURE <br />CONT. (%) DENSITY <br />(pcf) CONTENT <br />(%) COMPACTION WITHIN <br />SPEC TYPE NUMBER <br />260 (PT#4395) N19456.89,/E37632.66 6109,4 X 83,2 11,8 R4,f) 7 6 101;f1 gnb 177n r/r (n) 130/ <br />261 (PT#4396) N19442.85/E37462.97 6110.9 X 108.0 10.0 105.2 10.9 97.4 gob #228 & 229 r/C @ 19° <br />262 PT#4397 N19445.83/E37230.84 6111.6 X 106.8 10.2 98.5 12.2 92.2 gob #228 & 229 r/C @ 14% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSE RVATION / TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used,. <br />Compaction 90%+ Cohesive Soils X <br />Requirement: Cohesionless Soils Full Time: 0 Day: S M T W Th <br />X F S <br />Sheepsfoot: <br /> Part Time: Weather: Sun Clear Overcast Rain Snow <br />Specified x X Smooth Drum Roller: <br />Moisture N/A Cohesive Soils X <br />Requirement: Cohesionless Soils Number of Site Visits/Day: Temp: To 32 32-50 50-70 <br />X 70.85 85 Up <br />Vibratory: 0 <br /> Testing Only: Wind: Still Mod High <br /> Requested By (Company Name): X X Other (List Below): I <br />Laboratory Testing ASTM-698 Cohesive Soils X <br />Procedure: <br />Cohesionless Soils Humidity: Dry <br /> <br />X Mod Humid Haut Traffic <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: l Insufficient amount <br />of material placed, Informed (Rep of Company) Of Test Results: <br />Ty Hyatt /Load Out Services <br />Buckhorn was not informed prior <br />Contractor Not Working Due To: The Contractor Is: to our arrival on site that the <br />contractor would <br />ki <br />t b <br /> <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br /> <br />Processing Frozen Material: Processing Wet Material: <br /> <br />Stripping and/or Grubbing: Moisture Conditioning Dry Mat'I; <br />Field Copies Given To: <br /> <br />Contractor: <br />Client: no <br />e wor <br />ng <br />on this date. <br /> <br />Unknown: <br />Stockpiling Fill: =Removing Unsuitable Mat'i: CM/GM: <br />Other: PAGE 1 OF 1 <br />05-126-CMT Bowie Mine Gob Pile Stability.xls DCR4-23-091s#260-sj