Laserfiche WebLink
Project: :.........'i .................................................................. <br />' GEOTECH <br />:....................................... ..................................... <br />: Client / On Site Rep: <br />Bowie Resources / B. Bear <br />Bowie Mine Gob Pile Stability Civil, Structural & Geotechnical Engineers ..... <br />222 SOUth Park Ave <br />CO 81401 <br />- Montrose Contractor / Rep: <br />Load Out Services / Ty Hyatt <br />Project No: <br />2005126-CMT Date: <br />T 6/8/2009 , <br />. <br />Ph.: (970) 249.6828 - FAX: (970) 249-0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />L. Sanchez <br />DAILY CO MPACTION REPORT <br /> <br />T <br />S LOCATION TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB SAMPLE <br />E <br />T NUMBER Embankment Gob - Gob Pile No. 2 <br />Center Sloe <br />Slope GRADE ELEV <br />NUC <br />SAND DENSITY <br /> <br />(pCf) MOISTURE <br /> <br />CONT. (oho) DENSITY <br /> <br />(pcf) CONTENT <br />0 <br />(/o) COMPACTION WITHIN <br /> <br />SPEC TYPE NUMBER <br />274 PT#4409 N19412.13/E37635.15 6109.1 X 95.1 11.6 91.0 11.3 95.7 ox/gob #268 r/c @ 18% <br />275 (N I #4410) N19401.63/E37476.36 6109.6 X 92.7 12.1 94.5 12.0 101.9 owgob #268 r/c Oo 11% <br />276 PT#4411 N19433.93/E37180.36 6111.6 X 93.1 12.0 91.8 11.9 98.6 ox/gob #268 r/c 0 15% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION / TESTING FIELD OBSERVATIONS <br />Specified Date: _ Compaction Equipment Used: <br />Compaction o Cohesive Soils X <br />Requirement: 90 /o + <br />Cohesionless Soils Full Time: Day; <br /> <br />S M <br /> <br />X T W Th F S <br /> <br />Sheepsfoot: <br /> Part Time: Weather: Sun Clear Overcast Rain Snow <br />Specified x X Smooth Drum Roller: <br />Moisture N/A Cohesive Soils X <br />Requirement: Cohesionless Soils Number of Site Visits/Day: Temp: To 32 32-50 50-70 70.85 <br />X 85 Up <br />Vibratory: <br /> Testing Only: I Wind: Still Mod High <br /> <br />A <br />T Requested By (Company Name): X X Other (List Below): t <br />Laboratory Testing <br />S <br />Procedure; D698 Cohesive Soils X <br />Cohesionless Soils Loadout Services / Ty Hyatt Humidity: Dry <br />x Mod <br />X Humid Haul Traffic <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: 71nsmuffic'ient amount <br />rial placed. Informed (Rep of Company) of Test Results: <br />Ty Hyatt /Load Out Services <br />Buckhorn was not informed prior <br />Contractor Not Working Due To: The Contractor Is: to our arrival on site that the <br />contractor would n <br />t b <br />ki <br /> <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br /> <br />Processing Frozen Material: =Processing Wet Material: <br /> <br />Stripping and/or Grubbing: Moisture Conditioning Dry Man: <br />Field Copies Given To: <br /> <br />Contractor: <br />Client: o <br />e wor <br />ng <br />on this date. <br /> <br />Unknown: <br />Stockpiling Fill: =Removing Unsuitable Mafl: CM/GM: <br />Other: PAGE 1 OF 1 <br />05-126-CMT Bowie Mine Gob Pile Stability.xis DCR6-8-091s#274-ap