Laserfiche WebLink
Project: :.................................... ... <br />GEOTECH <br />:........................................ ......... ............................ Client / On Site Rep: <br />Bowie Resources / B. Bear <br />Bowie Mine Gob Pile Stability ............................................................................................. <br />Civil, Structural & Geotechnical Engineers <br />CO 81401 <br />222 South Park Ave. • Montrose Contractor / Rep: <br /> <br />load Out Services / Ty Hyatt <br />Project No: <br />2005126-CMT Date: <br />T 5/29/2009 , <br />Ph.: (970) 249-6828 • FAX: (970) 249-0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />L. Sanchez <br />DAILY CO MPACTION REPORT <br /> LOCATION <br />GR <br />V TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB SAMPLE <br />TEST NUMBER Embankment Gob - Gob Pile No. 2 <br />Center Slope ADE ELE NUC SAND DENSITY <br />(pcf) MOISTURE <br />CONT. (%) DENSITY <br />(pcf) CONTENT <br />(%) COMPACTION WITHIN <br />SPEC TYPE NUMBER <br />271 (PT#4406) N19539.59/E37662.86 6112.37 X 97.8 11.3 90.5 _ 12.4 92.5 ox/gob #268 r/c 0 19% <br />272 (PT#4407) N 19501.14/E37513.81 6112.44 X 94.5 11.8 89.9 15.7 95.1 ox/gob #269 r/c 0 15% <br />273 PT#4408) N19481.49/E37340.78 6112.58 X 94.9 11.8 85.7 15.0 90.3 ox/gob #270 r/c @ 15% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSE RVATION / TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction 90%+ Cohesive Soils X <br />Requirement: Cohesionless Soils Full Time: Day: S M T W Th F <br />X S <br />Sheepsfoot: <br /> Part Time: Weather: Sun Clear Overcast Rain Snow <br />Specified x X Smooth Drum Roller: <br />Moisture N/A Cohesive Soils X <br />Requirement: Cohesionless Soils Number of Site Visits/Day: Temp: To 32 32-50 50-70 70-85 <br />X 85 Up <br />Vibratory: <br /> Testing Only: EE Wind: Still Mod High <br /> Requested By (Company Name): X Other (List Below): <br />Laboratory Testing AST <br /> <br />Cohesive Soils X <br />Procedure: D698 8 <br />Cohesionless Soils <br /> <br />Loadout Services / Ty Hyatt <br /> <br />Humidity: <br /> <br />Dry <br />X <br /> <br />Mod <br /> <br />Humid <br /> <br />Haul Traffic <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: Insufficient amount <br />of material placed. Informed (Rep of Company) of Test Results: <br />Ty Hyatt / Load Out Services <br />B <br />was not informed prior <br /> <br />Contractor Not Working Due To: <br />The Contractor Is: t <br />o our <br />to our arrival on site that the <br />contractor would not be workin <br /> <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br /> <br />Processing Frozen Material: Processing Wet Material: <br /> <br />Stripping and/or Grubbing: Moisture Conditioning Dry Mat'I: <br />Field Copies Given To: <br /> <br />Contractor: <br />Client: g <br />on this date. <br /> <br />Unknown: <br />Stockpiling Fill: Removing Unsuitable Mat'I: CM/GM: <br />Other: PAGE 1 OF 1 <br />05-126-CMT Bowie Mine Gob Pile Stability.xls DCR5-29-091s#271-ap