My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-24_HYDROLOGY - C1996083
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1996083
>
2009-07-24_HYDROLOGY - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:04 PM
Creation date
7/24/2009 2:23:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
HYDROLOGY
Doc Date
7/24/2009
Doc Name
2nd Quarter 2009 Pond Inspection
From
J.E. Stover & Associates
To
DRMS
Permit Index Doc Type
Sediment Pond Inspect
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARTERLY POND INSPECTION REPORT <br />Bowie Resources LLC <br />Bowie No. 2 Mine- C-1996-083 <br />Identification <br />of Pond <br />s During Inspection: <br />wimate Water Level <br />lent (% total storage) <br />iw (cfs) <br />Quarter: Second 2009 <br />Inspection Date: 09-Jun-09 <br />B C D - Gob Pile F - New Gob J UTL East K UTL West I <br />Sediment Sediment Sediment Sediment Sediment Sediment <br />5947 5992 5975 5947.5 D Dry/Damp <br />15% 0% 0% 15% 0% 20% <br />0 0 0 0 0 0 <br />I I <br />Features Problem Problem Problem Problem Problem Problem <br /> Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No <br />Erosional <br />Rills & Gulleys No No No No No No <br />Inadequate Vegetation No No No No No No <br />Outlet Channel Erosion No No No No No No <br />Burrows No No No No No No <br />Other No No No No No No <br />Structural <br />Differential Settling No No No No No No <br />Cracks or Slides No No No No No No <br />Seepage No No No No No No <br />Other No No No No No No <br />Appurtenant Structures <br />Defective Spillways No No No No No No <br />Dewatering Devices Clogged No No No No No No <br />Faulty Gates, Etc. No No No No No No <br />Other No No No No No No <br /> <br /> <br /> <br /> <br />Additional Comments Design depth measured from pond bottom to invert of emergency spillway: <br /> Pond 6=10, C=10, D=7.7, J=9, K=3, F=10' TD <br /> Pond Bottom Elevations B=5942, C=5990, D=5972, F=5944, J=5847, K=5819 <br /> Water level in Pond C was 2' below the level of the primary spillway. <br /> The following four mud pits were inspected on July 21, 2009 with no problems cst00 <br /> 1) Hubbard Creek Shaft, 2) Two sites and mud pits at the mouth of Dove ?I,C?VB?9o <br /> Work has begun to close the Hubbard Creek Shaft mud pit. b E sl X00 <br /> <br />® o <br />0 <br />? o f o <br />Maintenance Required: Sediment needs removed from Pond F. s o q <br />0 19230 <br /> 0 <br />m 0 <br />too 0a. IZ2 01 <br />o 44,o <br />Name of Inspector: Jim Stover <br /> J. <br />E .W®? ?l` <br /> Colorado ? A0 Date
The URL can be used to link to this page
Your browser does not support the video tag.