Laserfiche WebLink
-4- <br />12. Primary future (Post-mining) land use (check one): <br />Cropland(CR) Pastureland(PL) <br />X Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />13. Primary present land use (check one): <br />__ Cropland(CR) Pastureland(PL) <br />X Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water.Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): Loader will excavate the gravel <br />and haul it to the crusher. <br />15. On Site Processing: X Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): loader loads the crusher and the material <br />is stockpiled for sale through out the year. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />Fuel will be stored on site when the processing equipment is on site. <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />The existing site is 7.57 acres and nearly our of reserves. The conversion <br />--------------- <br />will allow an additional 12 years of mining.