My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-24_REVISION - M1997027
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997027
>
2009-07-24_REVISION - M1997027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:49 PM
Creation date
7/24/2009 10:56:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997027
IBM Index Class Name
REVISION
Doc Date
7/24/2009
Doc Name
CN from 110c to 112c
From
AJ Botti Construction and Gravel Company
To
DRMS
Type & Sequence
CN1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOILS INFORMATION <br />EXHIBIT I <br />The soil survey performed by the NRCS covers the permit area. The soil mapping is shown on <br />Map C-1. The associated soil types descriptions are enclosed in this exhibit. <br />The primary soils of the site are: <br />1) 760 - Mesa clay loam, 0 to 2 percent slopes <br />2) 763 - Mesa gravely loam, 2 to 5 percent slopes <br />3) 793 - Cynfeske clay loam, 2 to 8 percent slopes <br />4) 802 - Typic Haplocambids, 12 to 60 percent slopes <br />5) 901 - Haplic Torriarents, (Gravel Pits) <br />6) 904 - Urban land and Lizzydea and Mesa soils, 0 to 5 percent slopes <br />Topsoil will be used to reclaim as it is stripped, with the exception of the initial stockpile which <br />will be used for final reclamation. As mining progresses and overburden is encountered, it too <br />will be used immediately for reclamation. By reclaiming while mining, all soil will be salvaged <br />as best as possible. <br />The topsoil pile will be seeded within a year after it is created with the same rangeland mix <br />shown in the reclamation plan. <br />It is expected that approximately 4" to 8" inches of strippable topsoil will be available from the <br />disturbed areas. <br />Moonscape Pit, July 2009 I-1
The URL can be used to link to this page
Your browser does not support the video tag.