Laserfiche WebLink
There are no dams on site, therefore the Office of the State Engineer does not need to be notified. <br />This pit will be operated above the water table and water to be used for dust suppression will be <br />supplied from Seep Creek. This site will not discharge water until vegetation is sufficient to <br />control erosion from stormwater, therefore, the Water Quality Control Commission does not <br />need to be notified. <br />7. Revegetation Success Criteria <br />Revegetation will be deemed adequate when erosion is controlled, and the vegetation is <br />considered satisfactory according to Division standards. <br />8. Monitoring Reclamation Success <br />Monitoring the reclamation on an ongoing basis will ensure its success. The operator plans to use <br />the local NRCS office to determine the capacity of the reclaimed land to control erosion. If <br />minor changes or modifications are needed to the seeding and reclamation plan, revision plans <br />will be submitted to the Division. It is hoped that the Division will provide assistance in <br />evaluating the success of the ongoing reclamation process. Information on all areas disturbed and <br />reclaimed as well as any other important items regarding the reclamation will be submitted in the <br />annual reports to the Division. <br />Moonscape Pit, July 2009 E-10