3. Haul Roads and Access <br />Portions of the existing farm road in the permit area will be removed and others altered. See Map <br />F for details. Access through the site will remain after mining. <br />4. Reclamation Timetable <br />The timetable for reclamation is shown below in Table E-2. Reclamation Timetable. Exhibit <br />L: Reclamation Costs describes the worst case bond scenario. <br />Table E-2 Reclamation Timetable <br /> Length of time to <br />Year Phase Comments <br /> com lete months <br />2009 1 Site Preparation, Topsoil stripping, build stockpile along northern 1 <br /> permit boundary. <br />2009- 2 Mine in Mining Area 1, stockpile topsoil. Seed the stockpile. Place 61.8 <br />2014 overburden on the pit floor. Seed the topsoil stockpile. <br />2014- 3 Mine in Mining Area 2, place topsoil on the sideslopes and pit floor 58.8 <br />2019 of Mining Area 1. Seed and mulch topsoiled area. <br />2019- 4 Mine in Mining Area 3, Place topsoil on the sideslopes and pit floor 26.2 <br />2022 of Mining Area 2. Seed and mulch topsoiled area. <br /> Remove scale and mobile equipment. Place stockpiled topsoil on the <br />2022 5 pit floor and sideslopes of Mining Area 3 and the pit floor of the 0.5 <br /> existing pit area. Seed and mulch topsoiled area. <br /> 148.3 <br /> Total <br /> 12.3 Years <br />Moonscape Pit, July 2009 E-8