Laserfiche WebLink
Table D-3 <br />X4MINV- TnNNAGV PER AREA <br />Phase Acres 1. <br />(Mined) Tons Gravel Gravel Life <br />(years) Exposed <br />Area <br />Acres/Year <br />1 5.54 225,247 1 5.54 <br />2 5.54 225,247 1 5.54 <br />3 5.54 225,247 1 5.54 <br />3 Mining Timetable <br />Mining operations would begin in late summer of 2009, provided that all permits are <br />granted. Mining may last approximately 10 years, although the market plays a large role <br />in the length of the mining. Urie Rock Company expects the average production from the <br />pit to be 48,900 tons per year. <br />4 Facilities and Eauiament <br />The site may contain: <br />A portable screening/washing plant with a 500 gallon diesel tank <br />A portable Asphalt plant with a 250 gallon diesel tank <br />A portable Concrete plant with a 500 gallon diesel tank <br />Portable Scales <br />A portable office trailer <br />A portable crusher with a 2,000 gallon diesel tank <br />- A fuel farm with a 10,000 gallon diesel tank <br />A portable QC lab trailer <br />A small portable shop trailer <br />Mobile equipment which will be used on site over the mine life: <br />1 or 2 Front end loaders <br />1 or 2 Bulldozers <br />I Motor Grader <br />- 1 Scrapper <br />- Track hoe <br />- 1 Water truck <br />- 1 Fueling Truck <br />Several off-road haul trucks <br />Various 24 ton and 14 ton road haul trucks as necessary to move the permitted <br />product to market <br />7