Laserfiche WebLink
C <br />G <br />vfi? <br />?01 <br />O <br />need some advice from the BLM concerning this. If the sampling program is deemed <br />complete before the end of the season and results are negative, the sample plant and all <br />other semipermanent equipment will be removed, the pond backfilled, the area <br />compacted in the operation ripped, and the topsoil replaced preparatory to seeding. Some <br />of this might not be done before 2010. The seeding will be done at a propitious time. <br />The entire schedule could fall apart if there are encouraging results from the program and <br />we go into a production mode. We realize that will require a plan of operations but the <br />exploration phase will merge right into it. A production facility would probably utilize <br />some of the same area as the exploration work did. <br />RECLAMATION COST ESTIMATE <br />If the drilling program proceeds as envisioned with a very light footprint. on the <br />ground, costs of reclamation will involve only the placement of drill cuttings and a <br />polyfoam plug with a little more drill cuttings and topsoil on top. The topsoil and any <br />scuffed areas from the drill rig will have to be raked out and seeded. Using per hole costs <br />of $35 to $50 for the described process and a maximum of 80 holes, the drilling area <br />reclamation costs should not be over $4000. The 150'X150' plant area will be scarified <br />or ripped to loosen any compaction and the settling pond will be backfilled. Then the <br />stockpiled topsoil will be placed over the resulting area. The topsoil will be prepared for <br />seeding which will take place when the weather is right. With the backhoe-loader this <br />can probably be done in a day once the plant is removed. The knockdown and removal <br />of the plant and associated facilities (water tank, pipelines, storage building) might take <br />four or five days at a cost of another $2000. The seeding of disturbed areas is a real <br />unknown because it might be necessary to return to the area when the weather is right and <br />that might be in hunting season when there are restrictions by the adjoining land owner or <br />maybe when the BLM has restrictions because of bird or wildlife breeding, :nesting, or <br />birthing seasons. In any event, the seeding will probably not cost over $2000 unless there <br />is some expensive seed involved. All this totals to $9000. I see that Russell Means has <br />come up with a price of $13,700 to $15,500 using a contractor where we would be doing <br />the work ourselves. By backfilling the holes as we go along, we would save a big part of <br />his estimated $3000 to $4000 and $1100 in mobilization-demobilization so we are not too <br />far apart using our different approaches. <br />It is p that a motor home will be kept on the site during opera ' s so that them <br />will be someone w the plant, rolling stock, and samples at es. If the <br />sampling results are ever ' a promotion for raismg mon der SEC regulations <br />the samples must have been contin 1 in the custody qualified person from the <br />time they were acquired until the final pro ' w one. We don't contemplate using <br />these results in a promotion but it could become . However, to satisfy that <br />requirement would mean that someone wo ve to be on site all through the <br />process so that they could swear that n `salting' has taken place. <br />A regularly serviced sanilet wi kept on the ite and the njo <br />contained. / _ <br />t JAI <br />C ,rP? <br />/ on, <br />?n ? Q1,? GAO/ ??LGGa <br />C?2J C.6? U?