Laserfiche WebLink
HYDROLOGY <br /> LIST OF APPENDIX <br /> (Continued) <br />APPENDIX NO. <br />7-8f.3 Pond 008 Principal Spillway Replacement As$uik Repoli <br />7-6f.4 Sediment Pond 008 Permanent Impoundment Demonstration <br />7~g Permanent Impoundment Pecoco <br />7~g.1 As-Built Report PECOCO Impoundment <br />7-6h Spill Control Pond #2 As-Built <br />7-6i As-Built Report Truck Wash Ponds <br />7-6-7 Small Area Exemptions <br />7-7 Alluvial Valley Floors Reconnaissance Investigation <br />7-8 Seneca Coal Company Water Rights <br />7-9 Aquifer Test Information <br />7-10 Mid-Term Review Revision (1984) <br />7-10A Surface Water Monitoring Site Rating Curves <br />7-106 Letters of Agreement Concerning Final Impoundments <br />7-11 Pond Inspedion Report Fortes <br />7-11A Sediment Pond Sediment Storage Survey <br />7-12 Postmining Drainage Control <br />7-12.1 As-Built Report Drainage Channel SIIPM-1 <br /> LIST OF EXHBITS <br />EXHIBIT NO. <br />7-1 Oil and Water Well Location Map <br />7-2 Hydrology Monitoring Site Location Map (Revised and Retitled, <br /> 1986) <br />7-2A Piezometric Contour Map of the Wadge and Wolf Creek Coal <br /> Aqu'ders and Water Table Contour Map of the Spoils <br />7-26 Piezometric Contour Map of the Wadge and Wolf Creek Coal <br /> Aqu'rfers and Water Table Contour Map of the Spoils <br />7-3 Regional Drainage Basin Map <br />7~ Premining °HYMO° Madel <br />7-5 HYMO Model Postmining Reach Map <br />7-6 Seneca II Mine Computer HYMO Routing Flows for 10, 25, and <br /> 100 Year Precipdation Event <br />7-7 Surface Hydrology Map <br />7-8 Wadge Impoundment #002 and Cross-Sedion <br />7-8A Wadge Impoundment #002 (Proposed Postmine) <br />7-9 Wadge Impoundment Outlet Details <br />7-10 N.W. Impoundment and Diversion Ditch <br />7-11 Northwest Impoundment 11003 <br />7-11A Northwest Impoundment #003 (Proposed Postmine) <br />• <br />• <br />CJ <br />TR-37 x Revised 01/06 <br />