Laserfiche WebLink
Monitoring Plan for Compliance with <br />the Plan for Augmentation <br />Monitoring <br />Site Instrumentation Parameters Frequency <br />Pond 006 Staff gage Volume (acre-ft) Yleeklyll <br /> Surface area (acres) <br />2 <br />Monthly <br /> l'la ter truck Volume (acre-ft) Daily <br /> 3 <br /> Stand pipe <br />Pond Y-1 Staff gage Volume (acre-ft) Weeklyl/ <br /> 2 <br /> Surface area (acres) Monthly <br /> <br />Pond Y-1 Outfall <br />Flume <br />Discharge (cfs) 4 <br />Variable <br /> s <br />Well No. 1 Flow meter Volume (acre-ft) Weekly <br /> Flow meter6 Volume (acre-ft) Meekly <br />Headgate on Temple Ditch <br />No. 1 Flume Discharge (cfs) Variable4 <br /> <br />Temple Reservoir No. 1 <br />N/A 7 <br />Discharge (cfs) 4 <br />Variable <br />Emrich Reservoir N/A Dischar e 7 <br />g (cfs) 4 <br />Variable <br />Sta a Coach Reservoir <br />g N/A Dischar e 7 <br />g (cfs) 4 <br />Variable <br />141eekly monitoring hta rch through November <br />2 <br />Monthly monitoring December through February (freezing conditions) <br />3Monitoring conducted by accounting for the number of water truck loads obtained <br />4 <br />In the event of a call, will be determined by Water Commissioner, Division 6, <br />Water District 57 <br />s <br />Flow meter on waterline to facilities (bathhouse, offices, etc.) <br />6F1 ow meter on waterline to 006 pond <br />7 <br />In the event of a call, monitering 4-ii 11 be conducted using appropriate device (portable <br />flume, current meter, etc.) as noproved by Water Commissioner, Division 6, Water District 57~ <br />Note: Data collected from monitors associated ivi th the augmentation plan is comoiled and <br />reported on a monthly basis to the Water Commissioner, Division 6, Water District s' <br /> <br />16-1-10 <br />