Laserfiche WebLink
C-1981-010 PR-06 <br />2°d Engineering Adequacy Review <br />02 July 2009 <br />Page 4 of 4 <br />Response: Additional detail has been provided in Section 4.4 of the report. <br />Item resolved - no further action is required. <br />7. Figures 25 and 26 depict the Initial Underdrain Location in plan and cross section. It is <br />not clear from these diagrams (refer also to item 3, above) what portions of HG Fill will <br />be constructed using the dragline, and what portions using trucks. <br />Please modem Figures 25 and 26 to illustrate the anticipated construction sequence for <br />the Horse Gulch Fill. <br />Response: Additional detail has been added to Section 4.4 regarding construction <br />sequence, extents of dragline spoil, and underdrain construction using the dragline. <br />Item resolved - no further action is required. <br />This concludes the Engineering Adequacy Review for the Trapper Mine PR-06. All items have <br />been successfully resolved. Please do not hesitate to contact me with any questions or comments <br />you may have regarding this review. <br />xc: Sandy Brown, DRMS