My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-15_REVISION - M1980244 (35)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-07-15_REVISION - M1980244 (35)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
7/21/2009 11:18:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/15/2009
Doc Name
LOB Relocate- Appendix J- Geomembrane Installation Observations
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRAIL'o <br />Project No: 84201125EO Project Title: <br />Owner: Cripple Creek and Victor Gold Mining Company Contractor: <br />Location: LOB Pad <br />Q FUSION Passing Trial Seams Date: <br />?ExrRUSION No. Time Tech ID <br />Geomembrane Seam Log <br />CC&V COA Phase 5 <br />Lonestar <br />4/26/2009 <br />Page 2 of 3 <br />TF-S-A 13:45 FT <br />Machine # 206 Destructive Length Carry-over <br />From Previous Log: 275' <br /> Seam S ection Machine Tern eratures °F Non-Destructive <br /> <br />Seam <br /> <br />Fi <br />i <br />h <br />Approx. Amb. Air <br /> <br />T <br /> <br />ld T <br />h <br />W <br />Machine Digital Set Indicator Approx <br /> <br />L <br />h Length from <br /> <br />P <br />i <br />Destruct <br /> <br />M <br /> <br />R <br />k <br /> <br />Number <br />Start Point n <br />s <br />Point <br />Start Time emp <br /> <br />( °F) ec <br />e <br />Speed <br /> <br />Wedge or Barrel <br />Nozzle <br /> <br />Wedge or Barrel <br />Nozzle engt <br /> <br />Welded rev <br />ous <br />Destruct <br />Number on. emar <br />s <br />Test Date <br />Mon. <br />P9A/P10A SEOS NEOS 14:38 42 FT 4 850-850 850-850 23' 298' TW <br />P8A/P9A EEOS WEDS 14:43 40 FT 4 850-850 850-848 44' 327'/15' D54A TW Pulled for freq 29'W of EOS <br />P8A/P10A EEOS WEDS 14:52 40 FT 4 850-850 850-849 123' 138' TW <br />P9A/P11A EEOS WEDS 15:22 41 FT 4 850-850 850-847 49' 9' D52A TW 40 V of EOS <br />P11A/P10A EEOS WEDS 15:33 40 FT 4 850-850 850-850 47' 56' TW <br />P10/P10A SECS NEOS 16:02 40 FT 4 850-850 853-855 23' 79' TW Tie-in to Existing <br />P11/P11A SEOS NEOS 16:07 40 FT 4 850-850 852-855 16' 95' TW Tie-in to Existing <br />P11A/P12A EEOS WEDS 16:18 40 FT 4 850-850 850-850 144' 239' TW End of Day's Work <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />*Reference seam endpoints from an end of seam (EOS), a repair number, Sheet Total Length) 469' (Reviewed by: JDH (Date: 4 29 09 <br />or a point location on the seam (i.e., reference point, distance, direction from ref. pt.) Destructive Length Carry Over 239'
The URL can be used to link to this page
Your browser does not support the video tag.