My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-15_REVISION - M1980244 (39)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-07-15_REVISION - M1980244 (39)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
7/21/2009 11:12:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/15/2009
Doc Name
LOB Relocate- Appendix D- Tech Specs 2
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />• <br />3.05 SCHEDULES <br />CONTRACTOR shall notify MANAGER at least forty-eight (48) hours before each concrete placement. <br />3.06 FIELD QUALITY CONTROL <br />A. Concrete testing will be performed by CONTRACTOR. <br />B. Four standard 6-inch diameter by 12-inch long test cylinders shall be prepared for every 50 yards of <br />concrete placed or for each placement, whichever is greater, at the discretion of the MANAGER, <br />DESIGN ENGINEER and CERTIFYING ENGINEER. <br />C. Standard compression tests shall be performed to determine the compressive strength: one at seven <br />(7) days, one at fourteen (14) days, and one at twenty-eight (28) days. The fourth cylinder shall be <br />kept in reserve for additional testing, if necessary. <br />D. Slump testing shall be performed at the time the cylinders are prepared. <br />*** END OF SECTION *** <br />• <br /> <br />Section 03300 Page 4 of 4 <br />Cast-In-Place Concrete <br />SAProjects\1125 CC&V Phase 5 VLF\I - Tech Specs\Arequa IFC Specs\03300.rt.doc <br />September 3, 2008 <br />Revision 1
The URL can be used to link to this page
Your browser does not support the video tag.