Laserfiche WebLink
amec? <br />• 3. CONTRACTOR shall repair damage resulting from handling and transport of geogrid at no <br />additional cost to CC&V. If irreparable, in the opinion of CERTIFYING ENGINEER, <br />damaged materials shall be replaced at no additional cost to CC&V. <br />C. Storage and Protection <br />MANAGER will provide area for on-site storage of the geogrid rolls from time of delivery <br />until installation. <br />2. The storage and handling of the materials is the responsibility of CONTRACTOR from the <br />time the materials are manufactured until the time the completed installation is accepted. <br />CONTRACTOR is responsible for preparing the storage location and for the protection of <br />the materials from the elements (e.g. ultraviolet light, moisture, temperature, etc.). <br />3. After CONTRACTOR has removed material from storage, CONTRACTOR shall protect <br />geogrid from puncture, dirt, grease, water, moisture, mud, mechanical abrasion, excessive <br />heat, and other sources of damage. <br />4. CONTRACTOR shall preserve integrity and readability of the geogrid roll labels, and store <br />the rolls such that MANAGER and CERTIFYING ENGINEER have access to the <br />package slips or roll labels for each roll to verify roll acceptance. <br />5. The rolls shall be stored on a prepared surface (not wooden pallets) and should not be <br />stacked more than two rolls high. <br />• <br />r: <br />Section 02776.1 <br />Geogrid <br />Page 3 of 6 September 3, 2008 <br />Revision 1 <br />SAProjects\1125 CC&V Phase 5 VLF\I - Tech Specs\Hrequa IFC Specs\02776.1 rt.doc