My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-15_REVISION - M1980244 (26)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-07-15_REVISION - M1980244 (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
7/21/2009 11:10:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/15/2009
Doc Name
LOB Relocate- Appendix D- Tech Specs 1
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />• SECTION 014001 EARTHWORKS CONSTRUCTION QUALITY ASSURANCE (COA) PI:AN <br />PART 1: INTRODUCTION <br />This plan addresses the construction quality assurance (CQA) procedures for the installation of the earthworks <br />(soils) components of the valley leach facility at the Cresson Project, Teller County, Colorado. This program <br />has been developed to assure that the construction of the soil components are in compliance with the project <br />SPECIFICATIONS and to demonstrate that the regulatory requirements for the construction are achieved. <br />The objective of this plan is to assure that proper materials, construction techniques, and procedures are <br />followed by the CONTRACTOR and that the intent of the design is met. This plan also provides the means <br />for resolution of problems that may occur during construction. <br />This plan addresses quality assurance, not quality control. This CQA Plan is independent of the quality control <br />(QC) programs conducted by CONTRACTOR. The intent of the CQA Plan is to provide independent third <br />party verification and testing, to demonstrate that the CONTRACTOR has met its obligations in the supply <br />and installation of earthwork (soils) materials according to the design, project SPECIFICATIONS, contractual, <br />and regulatory requirements. Quality control is provided by CONTRACTOR and refers to those actions <br />taken by the CONTRACTOR to ensure that materials and workmanship meet the :requirements of the <br />DRAWINGS and SPECIFICATIONS. <br />PART 2• DESCRIPTION OF PARTIES TO CONSTRUCTION QUALITY ASSURANCE <br />The following section provides descriptions of the parties to this CQA Plan including th6responsibilities and <br />• qualifications. <br />2.01 CC&V: <br />In this CQA Plan, CC&V refers specifically to Cripple Creek & Victor Gold Mining Company. CC&V owns <br />and operates the valley leach facility. <br />2.02 MANAGER: <br />In this CQA Plan, MANAGER refers to the individual appointed by the Cripple Creek & Victor Gold Mining <br />Company. MANAGER is the official representative of CC&V and is responsible for all construction <br />activities including oversight and direction during construction. MANAGER is also responsible for <br />coordinating construction and CQA activities for the project. <br />MANAGER shall serve as communications coordinator for the project, initiating preconstruction and <br />resolution meetings. As communications coordinator, MANAGER will serve as a liaison between all parties <br />involved in the project to ensure that ongoing communications are maintained. MANAGER and <br />CERTIFYING ENGINEER shall be responsible for the resolution of all CQA issues. <br />Duties for this position include the following: <br />¦ review and approval of DRAWINGS and SPECIFICATIONS for all soil components of the <br />valley leach facility; <br />¦ preconstruction coordination with the CQA Monitor to ensure that the CQA Monitor has <br />performed similar reviews of the DRAWINGS and SPECIFICATIONS to ensure that the <br />• CQA Plan can be implemented; <br />Section 01400.1 Page 1 of 9 September 3, 2008 <br />Earthworks CQA Plan Revision 1 <br />SAProjects\1125 CM Phase 5 VLF\I - Tech Specs\Arequa IFC Specs\01400.1.rl .doc
The URL can be used to link to this page
Your browser does not support the video tag.