Laserfiche WebLink
amec'At% <br />CONTRACTOR may use any type of earthmoving or excavating equipment unless otherwise noted in the <br />SPECIFICATIONS, provided the equipment is in a satisfactory condition, complies with. applicable rules and <br />regulations, is of such capacity that the construction schedule can be maintained as planned by <br />CONTRACTOR, and is approved by MANAGER. <br />*** END OF SECTION *** <br />• <br /> <br />Section 02200 Page 18 of 18 September 3, 2008 <br />Earthworks <br />Revision 1 <br />S:\Projects\1125 CC&V Phase 5 VLRI - Tech Specs\Arequa IFC Specs\02200.r1.doc