My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-15_REVISION - M1980244 (26)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-07-15_REVISION - M1980244 (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
7/21/2009 11:10:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/15/2009
Doc Name
LOB Relocate- Appendix D- Tech Specs 1
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ad% <br />ame <br />• 1. Select Structural Fill shall be placed for miscellaneous site grading as required by the <br />MANAGER and CERTIFYING ENGINEER. <br />2. CONTRACTOR shall condition Select Structural Fill to a moisture content that allows <br />compaction to the required density and that results in a firm, unyielding surface capable of <br />allowing the movement of vehicles and equipment over the surface without causing rutting <br />or other deleterious effects. <br />3. CONTRACTOR shall place Select Structural Fill materials with less than 30 percent rock <br />materials above 3/4-inch size in maximum 12-inch loose lifts, and compacted to 95 percent <br />of maximum dry density (ASTM D698). <br />4. CONTRACTOR shall condition and place Select Structural Fill containing more than 30 <br />percent rock materials above 3/4-inch size (rock fill) in maximum 12-inch loose lifts and <br />compact by a method compaction technique. The compaction equipment shall consist of a <br />minimum ten 10-ton (static drum weight) vibratory smooth-drum compactor. The number of <br />passes shall be subject to CERTIFYING ENGINEER's approval, at no additional cost to <br />CC&V. The method SPECIFICATIONS may be changed at any time, at the discretion of <br />CERTIFYING ENGINEER, based upon changes in material characteristics, field <br />conditions, and/or compaction equipment. <br />D. Underdrain Fill <br />1. Underdrain Fill shall be placed in the Underdrains as shown in the DRAWINGS. <br />• 2. CONTRACTOR shall condition Underdrain Fill that results in a firm, unyielding surface <br />capable of allowing the movement of vehicles and equipment over the surface without <br />causing rutting or other deleterious effects. <br />3. CONTRACTOR shall condition, place and compact Underdrain Fill by a method <br />compaction technique. The compaction equipment shall consist of a minimum 10-ton (static <br />drum weight) vibratory smooth-drum compactor. The number of passes and loose lift <br />thickness shall be subject to CERTIFYING ENGINEER's approval, at no additional cost <br />to CC&V. The method SPECIFICATIONS may be changed at any time, at the discretion <br />of MANAGER, based upon changes in material characteristics, field conditions, and/or <br />compaction equipment. <br />4. Provisions shall be made by CONTRACTOR for removal of oversize materials from fills, <br />at no additional cost to CC&V. <br />The MANAGER will minimize the amount of traffic over the Underdrain Fill. <br />E. Leak Detection Fill <br />Leak Detection Fill shall be placed in the Leak Detection Trenches as shown on the <br />DRAWINGS. <br />2. CONTRACTOR shall condition Leak Detection Fill to allow a surface that does not cause <br />rutting or other deleterious effects. <br />• F. Low Volume Solution Collection Fill <br />Section 02200 <br />Earthworks <br />Page 10 of 18 <br />September 3, 2008 <br />Revision 1 <br />S:\Projects\1125 CC&V Phase 5 VLF\I - Tech Specs\Arequa IFC Specs\02200.r1.doc
The URL can be used to link to this page
Your browser does not support the video tag.