amec'? <br />obtained and forward the sample to a third party geosynthetic laboratory. As a minimum, the following <br />conformance tests shall be conducted; with project requirements outlined in Section 02776, Article 2.01: <br />¦ Geomembrane: density (ASTM D1505) <br />carbon black content (ASTM D1603) <br />thickness (GRI-GM8) <br />tensile strength (ASTM D638) <br />All conformance tests shall be performed in compliance with the project SPECIFICATIONS. The CQA <br />Monitor shall review the test results and shall report any nonconformance to the MANAGER, <br />CERTIFYING ENGINEER and the Geosynthetics Installation CONTRACTOR. <br />6.03 CONSTRUCTION MONITORING AND TESTING: <br />The CQA Monitor shall monitor and test all geosynthetic components of the construction to verify that the <br />construction is in compliance with the project SPECIFICATIONS. The CQA Monitor shall identify <br />inadequate construction methodologies or materials which may adversely impact the performance of the <br />facility being constructed and existing structures. Visual observations throughout the construction process <br />shall be made to ensure that the materials are placed to the lines and grades as shown on the DRAWINGS. <br />The CQA monitor shall review the following submittals by INSTALLER during the project: <br />0 ¦ verification that a qualified land surveyor has verified all lines and grades; and <br />¦ subgrade surface acceptance certificates for each area to be covered by the lining system, <br />signed by the INSTALLER. <br />The CQA Monitor shall: <br />¦ Inspect all geosynthetic materials delivered to site. The CQA Monitor shall document any <br />damage and notify MANAGER; <br />¦ obtain geosynthetic packaging identification slips for verification and generation of an on-site <br />materials inventory; <br />¦ observe subgrade conditions prior to geosynthetics installation and verify that any <br />deficiencies, as defined in Section 02200 of the SPECIFICATIONS, are corrected; <br />¦ observe permanent anchoring of geosynthetics to verify that design and project <br />SPECIFICATIONS are met; <br />¦ observe that required overlap distances are met; <br />¦ monitor and record ambient air temperatures; <br />¦ verify that no continuous horizontal seams are placed on slopes unless approved by <br />CERTIFYING ENGINEER; and, <br />Section 01400.2 Page 6 of 11 September 3, 2008 <br />Geosynthetic CQA Plan Revision 1 <br />SAProjects\1125 CC&V Phase 5 VLF\I - Tech SpecsArequa IFC Specs\01400.2 rt.doc