amec? <br />• observe prepared subgrade prior to geosynthetic deployment; <br />¦ monitor and document geosynthetic material placement, trial seam testing, non-.destructive <br />testing, seaming and repair operations, and destructive testing; <br />¦ identify seam samples for CQA destructive testing; <br />¦ assure that testing equipment used, and tests performed are conducted according; to project <br />SPECIFICATIONS and industry standards; <br />¦ perform or observe, document, and report test results to MANAGER as required; <br />¦ report any deficiencies to MANAGER that are not corrected to the satisfaction of the CQA <br />Monitor, including design or project SPECIFICATION changes; and <br />¦ prepare a Construction Certification Report describing the construction, any deviations from <br />SPECIFICATIONS or, DRAWINGS and details, details of all field and laboratory details, <br />subgrade acceptance forms, test data, tests results (both laboratory and field), QC submittals, <br />geomembrane panel layout as-built prepared by the CQA Monitor, professional certification <br />that construction was completed in compliance with the DRAWINGS and <br />SPECIFICATIONS. The report will be signed and sealed by the CERTIFYING <br />ENGINEER registered in the State of Colorado. <br />2.06 GEOSYNTHETICS MANUFACTURER: <br />is The Geosynthetics Manufacturer, also referred to as the "MANUFACTURER", is responsible for <br />production of the geosynthetic components outlined in this plan. Each MANUFACTURER must verify <br />prior to construction that the MANUFACTURER can produce material that meets the requirements outlined <br />in project SPECIFICATIONS. <br />2.07 GEOSYNTHETICS INSTALLATION CONTRACTOR: <br />The Geosynthetics Installation Contractor, also referred to as the "CONTRACTOR" or "INSTALLER", is <br />responsible for installation of the geosynthetic components, as outlined in the project SPECIFICATIONS. <br />The INSTALLER must meet the requirements outlined in the project SPECIFICATIONS. <br />The INSTALLER will be responsible for storage, handling, deploying, temporary geomembrane <br />anchoring, seaming, repairs and non-destructive testing, in accordance with the project plans, <br />SPECIFICATIONS and the INSTALLER's internal quality control program. It is the INSTALLER's <br />responsibility to see that all submittals are received as outlined in the project SPECIFICATIONS. <br />2.08 EARTHWORKS CONTRACTOR: <br />The Earthworks Contractor, also referred to as "CONTRACTOR" is responsible for proper delivery and <br />placement of earthwork components as outlined in the project SPECIFICATIONS. <br />PART 3.0 LINES OF COMMUNICATION <br />The CQA Monitor shall be capable of direct communication with the MANAGER, DESIGN ENGINEER, <br />• CERTIFYING ENGINEER and CONTRACTOR at all times. Deficiencies that can be easily remedied, <br />Section 01400.2 Page 3 of 11 September 3, 2008 <br />Geosynthetic COA Plan Revision 1 <br />SAPro1ects\1125 CC&V Phase 5 VLF\I - Tech Specs\Arequa IFC Specs\01400.2 rl.doc