My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-15_REVISION - M1980244 (28)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-07-15_REVISION - M1980244 (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
7/21/2009 11:08:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/15/2009
Doc Name
LOB Relocate- Appendix C- Weekly Reports
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />LOB Mine Workings Summary FIGURE 2 <br />3/28/2009 <br />ID# Northin Eastin Elevation Comments <br />2001 50199.458 40213.67 10174.951 On edge of VLF footprint. Shallow shaft. Backfill with structural fill. <br />2002 49681.855 39111.85 10222.514 Shallow shaft. Backfill with structural fill. <br />2003 54670.511 37987 468 10189165 Not in LOB haul road footprint <br />2004 54317 717 37821.732 10112.226 In cut No remediation needed <br />2005 54228.037 38046.401 10174.113 Shaft or collapse into Raven Tunnel 10 100' elv. Working is in cut. no remediation. <br />2006 54066.629 3815184 10175.45 Not in LOB haul road footprint <br />2007 54048.3 38214 844 10190.934 Not in LOB haul road footprint <br />2008 54036.13 38197.064 10188.578 Not in LOB haul road footprint <br />2009 53994.91 38183 725 10168.716 Not in LOB haul road footprint <br />2010 53982 346 38121.653 10148.466 Shaft in cut. No remediation. Cut being performed in area <br />2011 53982.138 38121 823 10148 473 Shaft in cut No remediation Cut being performed in area <br />2012 54004148 38113.49 10151.034 Shaft in cut No remediation. Cut being performed in area <br />2013 54000.689 38085 834 10140 068 Shaft in cut No remediation Cut bein performed in area <br />2014 53974 82 38089 862 10133 673 Shaft in cut No rernediation Cut being erformed in area <br />2015 53978.476 37990.783 10100.628 Tornado Shaft at road elevation. Dee workings down to 9,000 ft elev. <br />2016 53897.186 37972.07 10079.118 Sto d at surface connected to Tornado Shaft. Could reach 9,000 ft elev. <br />2017 <br />2018 54129 748 <br />54573.755 37916 308 <br />37562.074 10106 209 <br />10071.456 In cut Likely no remediation required <br />Shallow shaft in cut. Backfill shaft with structural fill Removed during cut of LOB Pad <br />2019 54641 412 37585 877 10065.009 Shallow shaft in cut. Backfill shaft with structural fill. Horiz drift running east, will backfill. <br />2020 54652 14 37500 975 10037.916 Shallow shaft in fill. Backfill shaft with structural fill. Backfilled, drilled nothing found <br />2021 54749.88 37727 329 10090.254 Haulage tunnel in cut. No remediation Removed during cut <br />2022 54866.79 37768 44 10081.047 Shallow shaft in cut. Backfill shaft with structural fill. Backfilled <br />2023 55130.037 378838 10081.745 Not in LOB haul road footprint <br />2024 55065.199 38271248 10255.281 Not in LOB haul road footprint <br />2025 55147.916 38335.892 10257.719 Not in LOB haul road footprint <br />2026 55132.735 38272 95 10249.238 Not in LOB haul road footprint <br />2027 55164.21 37686.05 0 Haulage tunnel in fill. No remediation Fill laced Completed <br />2028 54615.713 37641 886 10068116 Pending comment from John Lupo Removed during cut of LOB Pad <br />2029 53959.714 38101.139 10124.015 Pending comment from John Lupo <br />2030 53693.594 38234 679 10071.748 Pending comment from John Lupo <br />2031 53780.553 37961.822 10049 108 Pending comment from John Lupo <br />2032 53704.086 37961731 10031.741 Pending comment from John Lupo <br />2033 53426.918 37966.416 9952.933 Pending comment from John Lupo <br />2034 53393 731 38048.556 9952 576 Pending comment from John Lupo <br />2035 53445 518 38116.952 9981 517 Pending comment from John Lupo <br />2036 53511 741 37946 571 9976.853 Pending comment from John Lupo <br />2037 53262.75 38599.62 9974.29 Pending comment from John Lupo <br />2038 53155.24 37951 52 9854.09 Walter Shaft Backfill the shaft with random backfill, Per Remediation Plan, 3/20/09 <br /> <br />2039 <br />52921 48 <br />38797 40 <br />9790 24 Mine Shaft' Backfill and geogrid cap, Per Remediation Plan, 3/20/09 WORK IN <br />PROGRESS this past week <br />FYI to Ames <br />53698 38233 Upper Raven Tunnel at 10,100 ft elev Tunnel portal will be intercepted as art of the road cut <br />54447 37794 Raven Tunnel at 10,100 ft parallels the road to 54273. 37991 <br />Road elevation is below tunnel, but contractor should be made aware of this working <br />Shcet 8 of I I <br />1,013 Weekly Report "T'04.04.09.1)
The URL can be used to link to this page
Your browser does not support the video tag.