Laserfiche WebLink
amec?-Y <br />• <br /> <br />Table 3 - Underground Remediation Summary <br />Completed LOB Mine Workings <br />5/9/2009 <br />ID# Northing Easting Elevation Comments <br />2001 50199.458 40213.67 10174.951 On edge of VLF footprint. Shallow shaft. Backfill with structural fill. <br />2002 49681.855 39111.85 10222.514 Shallow shaft. Backfill with structural fill. <br />2003 54670.511 37987.468 10189.265 Not in LOB haul road footprint <br />2004 54317.717 37821.732 10112.226 In cut. No remediation needed. <br />2005 54228.037 38046.401 10174.113 Shaft or collapse into Raven Tunnel @ 10,100' elv. Working is in cut. no remediation. <br />2006 54066.629 38153.84 10175.45 Not in LOB haul road footprint <br />2007 54048.3 38214.844 10190.934 Not in LOB haul road footprint <br />2008 54036.13 38197.064 10188.578 Not in LOB haul road footprint <br />20,09 53994.91 38183.725 10168.716 Not in LOB haul road footprint <br />2010 53982.346 38121.653 10148.466 Shaft in cut. No remediation. Cut being performed in area <br />2011 53982.138 38121.823 10148.473 Shaft in cut. No remediation. Cut being performed in area <br />2012 54004.148 38113.49 10151.034 Shaft in cut. No remediation. Cut being performed in area <br />2013 54000.689 38085.834 10140.068 Shaft in cut. No remediation. Cut being performed in area <br />2014 53974.82 38089.862 10133.673 Shaft in cut. No remediation. Cut being performed in area <br />2018 54573.755 37562.074 10071.456 Shallow shaft in cut. Backfill shaft with structural fill. Removed during cut <br />2019 54641.412 37585.877 10065.009 Shallow shaft in cut. Backfill shaft with structural fill. Horiz. drift running in an east. <br />2020 54652.14 37500.975 10037.916 Shallow shaft in fill. Backfill shaft with structural fill. Backfilled <br />2021 54749.88 37727.329 10090.254 Haulage tunnel in cut. No remediation Removed during cut <br />2022 54866.79 37768.44 10081.047 Shallow shaft in cut. Backfill shaft with structural fill. Backfilled <br />2023 55130.037 37883.8 10081.745 Not in LOB haul road footprint <br />2024 55065.199 38273.248 10255.281 Not in LOB haul road footprint <br />2025 55147.916 38335.892 10257.719 Not in LOB haul road footprint <br />2026 55132.735 38272.95 10249.238 Not in LOB haul road footprint <br />2027 55164.21 37686.05 0 Haulage tunnel in fill. No remediation Fill placed Completed <br />2028 54615.713 37641.886 10068.216 Removed during LOB Pad cut <br />2029 53959.714 38101.139 10124.015 Removed during LOB Pad cut <br />2035 53445.518 38116.952 9981.517 No Remiediation Required <br />2037 53262.75 38599.62 9974.29 No Remiediation Required <br />2039 52921.48 38797.4 9790.24 Backfll per remediation plan <br />2038, 53155.24 37951.52 9854.09 Backfill shaft with structural fill <br />•