Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Cresson Project ameO <br />Quality Assurance Monitoring and Test Results <br />Load Out Bin Relocation <br />• July 7, 2009 <br />7.0 CONCLUSIONS <br />In accordance with our responsibilities as the Certifying Engineer and as the Quality Assurance <br />Consultant for construction of the LOB, and per the requirements of the various applicable <br />DRMS approvals, AMEC Earth and Environmental (AMEC) attests that it observed and <br />performed the required CQA activities during construction of the LOB. Based on daily <br />communications with AMEC personnel, observations made during on-site visits, and review of <br />the laboratory and field test results, AMEC attests that the LOB was constructed in compliance <br />with the design plans and specifications as described in this document. <br />0 <br />• <br />SAPROJECTS\1125E CCV CQA\H3 - CONSTRUCTION\LOB CERT REPORT\REPORT BODY\LOB CERT REPORT 2009.07.07.DOC 23