My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-15_REVISION - M1980244 (23)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-07-15_REVISION - M1980244 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:22 PM
Creation date
7/21/2009 11:01:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/15/2009
Doc Name
QA Mon. & Test Results Load Out- Bin Location
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />n <br />l?J <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Load Out Bin Relocation <br />July 7, 2009 <br />amea&?,,? <br />determined that test results met or exceeded project specifications. The geomembrane roll <br />CQC certificates are presented in Appendix 1-4. <br />5.2.3 Welding Rod CQC Certificates <br />Welding rod certification consisted of resin CQC documents for the resin used to manufacture <br />the welding material for the Cresson Project. The welding material used on this project was <br />produced from 3 batches of resin. AMEC's review of the CQC certification indicates that the <br />resin used to manufacture the welding material met project specifications. The welding rod <br />CQC certificates are presented in Appendix 1-5. <br />SAPROJECTS\1125E CCV CQA\H3 - CONSTRUCTION\LOB CERT REPORT\REPORT BODY\LOB CERT REPORT 2009.07.07.DOC <br />16
The URL can be used to link to this page
Your browser does not support the video tag.