Laserfiche WebLink
• <br />n <br />l?J <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Load Out Bin Relocation <br />July 7, 2009 <br />amea&?,,? <br />determined that test results met or exceeded project specifications. The geomembrane roll <br />CQC certificates are presented in Appendix 1-4. <br />5.2.3 Welding Rod CQC Certificates <br />Welding rod certification consisted of resin CQC documents for the resin used to manufacture <br />the welding material for the Cresson Project. The welding material used on this project was <br />produced from 3 batches of resin. AMEC's review of the CQC certification indicates that the <br />resin used to manufacture the welding material met project specifications. The welding rod <br />CQC certificates are presented in Appendix 1-5. <br />SAPROJECTS\1125E CCV CQA\H3 - CONSTRUCTION\LOB CERT REPORT\REPORT BODY\LOB CERT REPORT 2009.07.07.DOC <br />16