My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-15_REVISION - M1980244 (23)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-07-15_REVISION - M1980244 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:22 PM
Creation date
7/21/2009 11:01:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/15/2009
Doc Name
QA Mon. & Test Results Load Out- Bin Location
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />• <br /> <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Load Out Bin Relocation <br />July 7, 2009 <br />3.0 GEOSYNTHETICS INSTALLATION <br />amecs <br />Geosynthetics installed in the LOB consisted of 100-mil single sided texture and 80-mil smooth <br />LLDPE geomembrane. The LLDPE geomembrane was manufactured by Poly-Flex of Grand <br />Prairie, Texas. Geomembrane installation activities for the LOB liner system included <br />deployment, seaming, and non-destructive and destructive testing of 100-mil single sided <br />texture and 80-mil smooth LLDPE geomembrane. <br />Lonestar installed approximately 30,277 square feet of geomembrane, including geomembrane <br />in the anchor trench and overlap. A construction blast in the LOB road cut above the LOB pad <br />on April 23, 2009 caused damage to several liner panels. The majority of panels 1 through 8, <br />10 and 11 were replaced. All of panels 14 through 21 were replaced. The removal and <br />placement of the new panels was completed between April 26 and April 28, 2009. <br />Approximately 5,934 square feet of the original geomembrane was undamaged and not <br />replaced. <br />Geomembrane was placed on compacted and approved SLF. Ames anchored geomembrane at <br />the limits of the LOB in an anchor trench a minimum of 3 feet deep by 2 feet wide. The <br />geomembrane tie-in panels overlapped the Phase IVc geomembrane panels a minimum of <br />3 feet and were extrusion welded, as shown in Detail 3 of IFC Drawing A250. <br />SAPROJECTSN 125E CCV COMM - CONSTRUCTIOMLOB CERT REPORnREPORT BODY\LOB CERT REPORT 2009.07.07.DOC <br />9
The URL can be used to link to this page
Your browser does not support the video tag.