U <br />• <br /> <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Load Out Bin Relocation <br />July 7, 2009 <br />3.0 GEOSYNTHETICS INSTALLATION <br />amecs <br />Geosynthetics installed in the LOB consisted of 100-mil single sided texture and 80-mil smooth <br />LLDPE geomembrane. The LLDPE geomembrane was manufactured by Poly-Flex of Grand <br />Prairie, Texas. Geomembrane installation activities for the LOB liner system included <br />deployment, seaming, and non-destructive and destructive testing of 100-mil single sided <br />texture and 80-mil smooth LLDPE geomembrane. <br />Lonestar installed approximately 30,277 square feet of geomembrane, including geomembrane <br />in the anchor trench and overlap. A construction blast in the LOB road cut above the LOB pad <br />on April 23, 2009 caused damage to several liner panels. The majority of panels 1 through 8, <br />10 and 11 were replaced. All of panels 14 through 21 were replaced. The removal and <br />placement of the new panels was completed between April 26 and April 28, 2009. <br />Approximately 5,934 square feet of the original geomembrane was undamaged and not <br />replaced. <br />Geomembrane was placed on compacted and approved SLF. Ames anchored geomembrane at <br />the limits of the LOB in an anchor trench a minimum of 3 feet deep by 2 feet wide. The <br />geomembrane tie-in panels overlapped the Phase IVc geomembrane panels a minimum of <br />3 feet and were extrusion welded, as shown in Detail 3 of IFC Drawing A250. <br />SAPROJECTSN 125E CCV COMM - CONSTRUCTIOMLOB CERT REPORnREPORT BODY\LOB CERT REPORT 2009.07.07.DOC <br />9