My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-10_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2008-12-10_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:46 PM
Creation date
7/21/2009 9:33:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
12/10/2008
Doc Name
Trapper G-Pit Landslide Mining Assesment
From
Agapito Associates Inc
Type & Sequence
PR6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Junuat-Y 15, 2008 I'gge 56 <br />5.5 Dragline Cut Face Stability and Monitoring <br />The plan for G-Pit is to switch from a T & S operation to a combination of T & S above <br />L-Scam and dragline below L-Seam. The bedding planes in this area are oriented more northerly <br />and has flattened to an 8°-10° dip. The dragline %ill work itself updip on spoil removing the <br />1.-M interburden and downdip removing the M-Q interburden. piling spoils behind to the west. <br />Meanwhile, the T & S fleet is expected to proceed 1-2 cuts ahead and will truck spoil around the <br />dragline to previous K-Pit cuts. The disturbed interburden within the landslide will be handled <br />by the T & S operation, the undisturbed lower interburden will be moved by dragline. <br />The eastward advance of the dragline cuts is expected to be favorable for highwall <br />stability. Bedding will have a slight dip back into the highwall face. This helps stabilize the <br />loose blocks. This operation is similar to that currently being carried out in the F-Dip Pit, except <br />the highwall will not be as high (-120 ft). It is anticipated that normal pre-splitting and cleaning <br />of the 75° highwall face will result in a stable highwall face below the I.-Seam. It is <br />recommended that 25-11-wide by 50-fl-high catch-benches be used on the highwall. The upper <br />T& S cuts \k ill be laid back at I H:I V. <br />The only location were rock mass disturbance might be significant below the t_-Seam is <br />near the old G-Dip box cut area. In this location the G-Dip floor buckled upward. This area <br />(cuts 6-9 through G-I I) is planned for mining in 2015. Additional characterization may be <br />needed at that time to characterize the extent ofdisturbance below L-Seam. If'the rock below <br />L-Seam is disturbed, the highwall should be laid back to IWIV or flatter depending on <br />conditions. <br />The likelihood of the landslide reactivating is difficult to quantity. Sudden large-scale <br />movement similar to the 400 ft of' movement already experienced might pose a safety hazard to <br />personnel. Such reactivation movement is thought to be unlikely because of the stabilizing <br />effects ofthe current toe pile plus the following factors. <br />Placing K-Pit spoils at the toe of the landslide in the old G-Strike Pit area provides <br />resistance to additional movement. <br />Mining the updip crest of the landslide early in the sequence reduces loading on the <br />landslide resulting in a more stable condition. <br />Ifa small portion of the landslide breaks free and slides into the old G-Dip cut, it is not <br />anticipated to move very tar (1-10 ft) nor is it likely to move suddenly because there is a rubble <br />pile at its toe which helps stability. Backfilling the G-Dip cut is not anticipated at this time. The <br />dragline will be operated from an engineered spoil pile for which landslide reactivation <br />movement would be away from the equipment and personnel. <br />Monitoring global movement of' the landslide block should be continued. It is not <br />anticipated that additional survey benchmarks will be required unless the existing benchmarks <br />are damaged or destroyed. Monitoring Iicquency should be increased in when the autumn rains <br />are more frequent and in the spring when the winter melt is compounded by spring rains. When <br />displacement rates indicate acceleration, survey frequencies should be increased until rates <br />stabilize. <br />Agapito Associates, Inc.