My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-16_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2009-07-16_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:18:58 PM
Creation date
7/17/2009 10:48:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
7/16/2009
Doc Name
Receipt of Seepwater Pipeline Extension Drawings
From
DRMS
To
Climax Molybdenum Company
Type & Sequence
TR4
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 COLORADO <br />[ <br />Phone: (303) 866-3567 D IV[ SION OF <br />RECLAMATION <br />FAX: (303) 832-8106 MINING <br /> <br /> SAFETY <br /> Bill Ritter, Jr. <br /> Governor <br /> Harris D. Sherman <br />July 16, 2009 L,-" Executive Director <br />/ Ronald W. Cattany <br />Division Director <br />Mr. Tim Haynes Natural Resource Trustee <br />Climax Molybdenum Company <br />19302 County Road 3 <br />Parshall <br />CO 80468 <br />, <br />RE: Receipt of Seepwater Pipeline Extension Drawings, Henderson Mill, <br />Technical Revision TR-04, Permit No. M-1977-342 <br />t/ <br />Dear Mr. Haynes: <br />Thank you for your letter dated July 8, 2009 and the drawings for the tailing pond seepwater pipeline <br />extension project. The seepwater pipeline is an environmental protection facility as defined in rule 1.1(15) <br />of the Mineral Rules and Regulations of the Colorado Mined Land Reclamation Board. The Division of <br />Reclamation, Mining, and Safety (DRMS) has determined that specific inspections of this project under rule <br />7.4 are not required, and has further determined that the pipeline extension may be placed into service prior <br />to the DRMS acceptance of the construction certification required under rules 7.3 and 7.4. However, the <br />rules do require, and your letter states a commitment to provide as built drawings and the certification as <br />soon as possible after the project is complete. <br />If you have any questions, please contact me. <br />Sinc <br />Allen C. Sorenson <br />Reclamation Specialist <br />C:\acs files\My Documents 4-19-06 through\henderson seep pipe extension.docx <br />Office of Office of <br />Minprd I and Rpri;imntion nonvar . rranfl bi-tinn . ne rana^ A-;.- -A 1....,..:..,. LA:..--
The URL can be used to link to this page
Your browser does not support the video tag.