Laserfiche WebLink
3 (Form 2- Public) <br />C. LOCATION MAP: Attach. a USGS 7.5 minute quad, or similar map of adequate scale, which locates the prospecting <br />site(s). <br />D. Are prospect sites (e.g., drill holes, trench locations, etc...) staked on the ground? Yes X_ No _ , ,._.. <br />E. Specify the Land Management Agency, Address and'l'elephone Number: <br />Ed Cotter, SM Stoller <br />U.S. D.O.E. - GJO, 2597 B-3/4 Road <br />Grand Junction, CO„ 81502-5504 <br />F. The prospector is required to document that the NOI has been sent to the BLM or the USFS. Processing of the NOI will <br />not begin until the prospector has submitted evidence acceptable to the Division that the NOI was sent to the BLM or <br />USFS. Check one: <br />Evidence of notification is attached to this NOI for BIN Land <br />Evidence of notification is attached to this NOI for USFS Land. <br />X Other proof of notice is attached to this NOI <br />H. MAPS & DRAWINGS <br />Accurate topographic base map showing the location of the proposed project must be submitted with this notice. The prospector <br />may submit a U.S.G.S. 7.5 minute quadrangle, or similar map of adequate scale that: <br />1. identifies the proposed prospecting site(s) or activity areas involving surface disturbance. Activity areas include all drill holes, <br />mud pits, excavations, trenches, adits, shafts, tunnels, rock dumps, stockpiles, impoundments and prospecting roads, and <br />2. includes sufficient detail to identify and locate known prospecting features and facilities that may be affected and those that <br />are not anticipated to be affected. This includes the location of all drill. holes, mud pits, excavations, trenches, ad-its, shafts, <br />tunnels, rock dumps, stockpiles, impoundments and prospecting roads. Color photographs, adequately labeled (including <br />date, orientation and location), of the prospecting site may be used to fulfill this requirement if included with the NOI <br />submittal. <br />III PROJECT DESCRIPTION <br />1. Mineral(s) and/or Resource(s) being Investigated: _Uranium (UO$? and Vanadium (V20?) <br />2. Estimated dates of commencement and completion: <br />Commencernent: _-A.fterl....Ju 2009 ._....__....---...?---.--- <br />Completion: _ -Before-30-. -2009_._...._.___....._., <br />3. Amount of material to be extracted, moved or proposed to be moved:_,__N/A,_.,_,-,___-_.__._-__._.. <br />4. Identify the type or method of prospecting proposed and quantity (place an "X") <br />Cuts Pits -Trenches <br />shafts 'runnels _Adits Declines <br />XX_ Air Drilling Fluid Drilling _Drilling & Blasting