Laserfiche WebLink
6 (Form 2- Public) <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Topsoil, if present, is estimated to be less than 1 foot deep. Any topsoil disturbed will be saved, stockpiled <br />o one side n r ?li? ributed over said disturbed area during reclamation. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Any cuttings are to be returned to the hole to the extent possible. Remaining cuttings will be buried in the <br />_containment pits. The holes will be plugged with spray foam from five feet to within two feet of the surface <br />and filled with availahle coil and or soil mixed with cuttings. <br />5. Describe how portals, adits, shahs, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />The topsoil from the containment pits will be bermed on the lower side. When reclaiming the site the <br />bermeel soil will be pushed back across the pits, dragged or raked and seeded with the ap1roved seed <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition.: <br />.,_.Na.raad.Ad turbance is._expected._________......_...._ ............._.