Laserfiche WebLink
4 (Form 2- Public) <br />5. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />One drill site _(approx 20'x-50j adjacent to an existing road. The site (PDH-SR13A-2009-01) will require an off-road <br />over-thround access trail of about 75 feet. Only actual disturbance expected is for the D.O.E. mandated mudpit for the <br />- ----------- - <br />„drill site„(see section III-6-I . No surface disturbance for the drill pads or access trail is. anticipated. The historic drill <br />records indicate that the hole will be dry <br />6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 1.,,,,,-_--••--- Average Width 20 (ft) Average Length --_?p__......._.,_.._O <br />B. Drill Holes: Quantity_.1__. Depth .__W720 - ` (ft) Diameter <br />C. Mud Pits: Quantity I Average Width _10 (ft) Average Length 10 (ft) <br />Average Depth 3 (ft) <br />Described proposed underground work: including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />None <br />D. Other Disturbances (please describe): <br />E. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br /><24!?.gal....diesel._fm..el._and55...-,gal_or less, motor oils and./_or hydraulic. fluids used by drill rigs,and support <br />.-----,Vehieles: --Fuel,-oils-and-fl.uid.s. will-he-stored..in_the_.beds...of..lhe_support.,uehieles_-anal. remo.v...p- from,the ___.__. <br />---dril-ling-area-at-the end-of-eaeh-day--._..... --- ---..___...._......... --._....__......_...._.._ ---- - --- _ -- --- .._._......._-,_.._................_........._..._.._....._.__........_._..._. <br />F. New Road(s): Length (ft) Width (ft) <br />Significantly Upgraded R.oad(s) Length (t3) Width - (ft) <br />Are culverts or other crossings proposed? If so; please describe: NQne-,proposed__ ,_..--_,___----._ ........