My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 7/16/2009, 2:33:49 PM-MR1
DRMS
>
Public
>
PERMIT FILE - 7/16/2009, 2:33:49 PM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:39 PM
Creation date
7/16/2009 2:52:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009019
IBM Index Class Name
PERMIT FILE
Doc Date
7/7/2009
Doc Name
New NOI (non-confidential)
From
Cotter Corporation
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX A <br />DRMS Form 2 Non Confidential <br />COTTER CORPORATION <br />Western Slope Operations <br />LP-21 2009 Exploration Project <br />Proposed Action <br />Introduction <br />Cotter Corporation proposes to conduct exploratory drilling on the Department of Energy's <br />Lease Block LP-21, located about 5 miles south of the historic townsite of Uravan, Montrose <br />County, Colorado. The proposed action consists of boring two air rotary holes and is intended to <br />obtain infill information gaps about historic drill-indicated mineralization and mineral trends. <br />The proposed drill holes (LP21-2009-01 and LP21-2009-02) are located in the NW1/4 SW1/4 <br />Sec. 27, T. 47N, R17W, New Mexico Prime Meridian. Approximate GPS coordinates (Lat/Long <br />WGS84) for the two holes, 01 and 02, are 38.29735, -108.738834, and 38.29765, -108.73912, <br />respectively. The proposed drill sites are located adjacent to an existing road. One site, LP21- <br />2009-02 will require about 100 feet of an off-road, over-the-ground access trail. Construction <br />(e.g. physical disturbance) of a new access road will not occur. <br />Starting Date and Duration <br />Drilling is proposed to start early in the 3rd quarter of 2009. The actual date will depend on <br />permitting and drill rig availability constraints. Drill program duration should be a couple of <br />days. <br />Pre-Drilling Survey <br />Given the size of the program, that the proposed drill pads will be adjacent to an existing road, <br />and the presence of numerous historic drill holes in the immediate area, no pre-drilling surveys, <br />such as archeological, wildlife, or endangered species, are planned. Should a regulatory agency <br />determine that a pre-drilling survey is needed, then Cotter will coordinate with that agency to <br />make sure that an effective survey occur. <br />Drilling Information <br />Two holes are proposed for the lease tract. Estimated depths will be about 225 feet. The holes <br />will start in sediments belonging to the Brushy Basin Member of the Jurassic Morrison
The URL can be used to link to this page
Your browser does not support the video tag.