My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-15_REPORT - C1981022
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981022
>
2009-07-15_REPORT - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:48:47 PM
Creation date
7/15/2009 2:48:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Report
Doc Date
7/15/2009
Doc Name
2nd Quarter 2009 Coal Mine Refuse Pile Inspection
From
Oxbow Mining, LLC
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Client: O>-q Mining <br /> <br />Project: GOB Pile <br /> <br />Location: <br /> <br />Rock correction applied to proctor, as needed <br /> <br />TEST TYPE: Nuclear (ASTM 2922) Nuclear (ASTM 2922) <br />Backscatter Direct Trans. X <br />Report No: <br /> <br />Date of Test: <br /> <br />Test By: RL <br /> <br />GJLD Job No: <br />(ASTM D-1556) SPECIFICATIONS: Project: City: X <br />Sand Cone <br />1 <br /> <br />4-27-09 <br /> <br /> <br /> <br />3712-GJ <br />County: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ate: <br />Test tion of Test <br />No. COMPACTION COMPAC. MOISTURE MOISTURE PROCTOR SOIL <br /> % SPEC. % CONT. % SPEC. % VALUE TYPE <br />I GOB pile, east end <br /> 100 95S 12.4 N/A 71.8@15.7 Coal <br />2 GOB pile, center <br /> 100 95S 10.2 N/A 71.8@15.7 Coal <br />3 GOB pile, west end <br /> 100 95S 13.2 N/A 71.8@ 15.7 Coal <br />DISTRIBUTION: KEY: Fails Compaction Spec. C = Cohesive GRAND JUNCTION LINCOLN DeVO C. <br />I -Client <br />•• Fails Moisture S <br />pec. <br /> <br />NC = NonCohesive BY:` <br /> S Standard Proctor ABC = Aggregate Base FILL DENSITY TEST DAILY REPORT <br /> M Modified Proctor PR = Pit Run <br />NOTE: Results indicate in-place soil densities at the locations and <br />depths identified above. Grand Junction Lincoln DeVore has r <br />li <br />d Nuclear Density Testing of `pit run' or <br />h Nuclear Density Testing is GRAND <br />e <br />e <br />on the contractor to provide uniform mix placement and <br />compactive effort throughout the fill area ot <br />er coarse grained soils may require <br />correction of Unit Weight And Water performed for acceptance <br />control and is combined with <br />JUNCTION <br />Geotechnical <br /> Contest ASTM D-4718. If soils contain <br />i visual and penetration i LINCOLN <br />DeVORE Engineers- <br /> overs <br />ze particles in excess of the limits of methods. - Geologists <br /> ASTM D-4718
The URL can be used to link to this page
Your browser does not support the video tag.