Laserfiche WebLink
EXHIBIT D <br />MINING PLAN <br />Mining will star at the northeast corner of the expanded area and proceed west <br />and south towVvateO s the southwest corner of the new area (shown in blue). The <br />area will be ex w ith-hacked dozers and rubber tired loaders to a depth aof <br />approximately 9216 feet. Maximum depth will be approximately 25 feet; no <br />excavated slops will exceed 3:1. <br />The excavated rhaterial will be fed into a portable crusher plant consisting of a <br />primary jaw, a sec:ondory cone -crusher and various screens and conveyors to <br />separate produi ts. <br />The various proIducts will. be stockpiled within the permit area and transported <br />out of the pit bX truck over the existing access road. The newly expanded pit area <br />period and the crushing and processing <br />will be mined o0er a 10 over a 5 year I <br />equipment will rnair in the older: area original!Ypermitted in 2t? This will <br />enable the lano remain within the existing berm, thus being hidden from view <br />p , <br />by landowners primarily to the east and across CR D.S. <br />fadl'tiis include a pormbie toilet and a solid waste container provided by <br />Sanitary , <br />a lacal wate haling contractor.