My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-23_REVISION - C1980004 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2008-01-23_REVISION - C1980004 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:21:24 PM
Creation date
7/15/2009 11:16:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
REVISION
Doc Date
1/23/2008
Doc Name
Letter Regarding BLM Letter
From
DRMS
To
J.E. Stover & Associates
Type & Sequence
MR44
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 C O L D RA D O <br />Phone: (303) 866-3567 D I V I S I O N o f <br />FAX: (303) 832-8106 RECLAMATION <br /> MINING <br /> SA ETY <br /> <br />January 23, 2008 <br /> Bill Ritter, Jr. <br /> <br />Jim Stover Governor <br /> <br />J.E. Stover & Associates Harris D. Sherman <br />Executive Director <br />P.O. Box 60340 Ronald W. Cattany <br />Grand Junction <br />CO 81506 Division Director <br />, Natural Resource Trustee <br />RE: McClane Canyon Mining LLC, McClane Canyon Mine <br />Minor Revision Application No. 44 (MR-44) <br />Sediment Drying Area Expansion <br />BLM Letter <br />Dear Mr. Stover: <br />The Division has received the enclosed letter from the BLM Grand Junction Field Office, <br />containing conditions related to tree clearing, soil salvage, cultural resources, and <br />notification prior to disturbance. Please adhere to the BLM conditions in implementing <br />the expansion addressed in MR-44. In addition, please provide the same notification of <br />disturbance and photo documentation to the Division that is provided to BLM in <br />association with their Conditions 1 and 4. Although not specified in the BLM letter, <br />snow will need to be cleared from the soil salvage area and from the portion of the topsoil <br />stockpile where the salvaged soil will be placed, prior to topsoil removal and stockpiling. <br />Please contact me if you have any questions. <br />SincerelyYathews, Daniel Environmental Protection Specialist <br />C: Denver File <br />Catherine Robertson, BLM Grand Junction <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.