Laserfiche WebLink
We were advised that the wash plants had produced approximately 113,400 tons of waste coal during the <br />month of April 2009: approximately 105,650 tons during May 2009: and approximately 89,950 tons during <br />June 2009. It is our understanding that the fines being produced at the wash plant, which consists of <br />approximately 10 to 20 percent of the total materials being produced, are being pumped underground into <br />the mine. <br />Based on our limited observations, it appears that the pile is currently being constructed and maintained in <br />general accordance with the project specifications and plans submitted under 2.05.3(8) and that the <br />potential hazard to human life and property at the site in its present condition is minimal. The only <br />exception to this is the present condition of the roadways at the site. This report fulfills the quarterly <br />inspection requirements as specified by Rules 4.09.1(11)(a), 4.09.1(11)(b), 4.10.2(2)(a) and 4.10.2(2)(b). <br />If you have any questiory(reording this report or our observations, please contact this office. <br />Sincerely, <br />NWCC, INC., Q, P ?cG/ " <br />V <br />Brian D. Len, '?-- <br />" -7 <br />cc: Janet Binns - f O?{ c'ction Specialist - CDRM&S <br />Job Number: 99-3983 NWCC. Inc. Pale 2