Laserfiche WebLink
RELATIVE COMPACTION TEST RESULTS <br />PROJECT: West Elk Refuse Pile Expansion <br />SITE LOCATION: Somerset <br />PROJECT NO: M09011MT <br />ENGINEERING TECHNICIAN: Hayes <br />DATE: Wednesday, Apr/22/09 <br />Page 2 of 2 <br />CLIENT: Mountain Coal Company <br />NUCLEAR GAUGE USED: 18 <br />Laboratory # 1445 <br /> <br /> <br />TEST <br />NO <br /> <br />TEST LOCATION <br />DEPTH OR <br />ELEVATION <br />PROBE <br />DEPTH <br />I LABORATORY <br />PROCTOR <br />DENSITY <br />(PCF OPTIMUM <br />MOISTURE <br />CONTENT <br />% <br />DRY <br />DENSITY <br />PCF <br />MOISTURE <br />CONTENT <br />RELATIVE <br />COMPACTION <br />SOIL TYPE <br />147 RPE-13 6168.86 8 80.0 14.0 84.7 15.0 100 Coal Gob, Black <br />148 RPE-14 6166.23 8 80.0 14.0 81.3 14.6 100 46 « <br />149 RPE-15 6167.93 8 80.0 14.0 81.9 15.3 100 46 44 <br />150 RPE-16 6168.18 8 80.0 14.0 83.4 14.1 100 64 « <br />151 RPE-17 6164.37 8 80.0 14.0 84.3 14.3 100 44 « <br />152 RPE-18 6162.85 8 80.0 14.0 80.4 15.5 100 66 66 <br />153 RPE-19 6160.72 8 80.0 14.0 79.4 15.7 99 " 64 <br />154 RPE-20 6159.18 8 80.0 14.0 81.4 14.6 100 " (L <br />155 RPE-21 6158.15 8 80.0 14.0 81.8 13.2 100 " LL <br />156 RPE-22 6156.37 8 80.0 14.0 85.9 15.2 100 66 46 <br />157 RPE-23 6155.67 8 80.0 14.0 85.7 9.6 100 " 46 <br />158 <br />TTIR RPE-24 <br />Ti?[1_ Tl. 1. 6154.79 8 80.0 14.0 84.4 13.2 100 " cc <br />1cr.1V1L'H1c1L7: 11C LesL results indicate only ine aenslty and moisture content for the location and elevation tested only. <br />op , A <br />" +swo?? <br />PROJECT NUMBER: M09011MT