Laserfiche WebLink
TRUCKS OUT <br />STOCKPILES <br />I . <br />CONVEYOR <br />CRUSHERS <br />SCREENS <br />WATER TANKER <br />GENERATOR <br />FUEL TANK <br />G AVEL INPUT <br />GRAVEL PROCESSING PLANT <br />TYPICAL 5 TO 7 ACRES <br />COUNTY ROAD EE <br />1 1 <br />r <br />MINE ENTRANCE SIGN � it <br />GATED SITE ACCESS <br />i <br />I ii i <br />, <br />I rr I <br />I r <br />i rf i <br />II, GRAVEL ACCESS ROAD, 16' WIDE <br />r <br />r <br />%r \ <br />\ I. <br />STOCK WATER TANK i \ <br />_ _ -- - AND CATTLE FEED SITE <br />I i <br />UNDERGROUND WATER LINE <br />i <br />i <br />RECLAMATION MATERIAL STOCKPILE <br />SIGN �— <br />i <br />STORMWATER BASIN <br />WATER TANKS ', ,. .;���. <br />SIGN <br />.v BERM <br />EXISTING PERMIT M- 2004 -055 <br />J \ I <br />� I I <br />v BOUNDARY � i l .-� 4 0 0 <br />_ -t5 SIGN <br />- \ <br />SIGN <br />INITIAL GRAVEL PLANT <br />\ V A <br />i LOCATION <br />(SEE DETAIL) <br />w k <br />' EXISTING - - - - - <br />I MINED AREA � \ <br />I SIGN <br />. ..__. ,.:SIGN - <br />- -- BOUNDARY <br />_ <br />EXISTING PERMIT I <br />` 25' SETBAC R 4 <br />� 1 <br />P �� � (� 25' SETBACK / <br />' v � FUTURE ( , \ i` (TrP`) / <br />/ �. <br />, I MINING ARE <br />\ � i <br />PROPERTY BOUNDARY WITH <br />RAND BARBED WIRE <br />PROPOSED PERMIT BOUNDARY •+��. 200 // 3 ST <br />! \ SETBACK / <br />p <br />\ <br />POWER POLES -250' O.C. <br />GRAPHIC SCALE <br />200 0 100 zoo 40D <br />( IN FEET ) <br />1 inch = 200 ff. <br />LEGEND <br />PROPOSED PERMIT BOUNDARY <br />- - - <br />- EXISTING PERMIT BOUNDARY <br />/ <br />- — PROPERTY LINE <br />200' SETBACK <br />MINING BOUNDARY <br />—---- - - ---- <br />DITCH / WATERWAY <br />- <br />-- OVERHEAD UTILITY LINE <br />- <br />TRUCKS OUT <br />STOCKPILES <br />I . <br />CONVEYOR <br />CRUSHERS <br />SCREENS <br />WATER TANKER <br />GENERATOR <br />FUEL TANK <br />G AVEL INPUT <br />GRAVEL PROCESSING PLANT <br />TYPICAL 5 TO 7 ACRES <br />COUNTY ROAD EE <br />1 1 <br />r <br />MINE ENTRANCE SIGN � it <br />GATED SITE ACCESS <br />i <br />I ii i <br />, <br />I rr I <br />I r <br />i rf i <br />II, GRAVEL ACCESS ROAD, 16' WIDE <br />r <br />r <br />%r \ <br />\ I. <br />STOCK WATER TANK i \ <br />_ _ -- - AND CATTLE FEED SITE <br />I i <br />UNDERGROUND WATER LINE <br />i <br />i <br />RECLAMATION MATERIAL STOCKPILE <br />SIGN �— <br />i <br />STORMWATER BASIN <br />WATER TANKS ', ,. .;���. <br />SIGN <br />.v BERM <br />EXISTING PERMIT M- 2004 -055 <br />J \ I <br />� I I <br />v BOUNDARY � i l .-� 4 0 0 <br />_ -t5 SIGN <br />- \ <br />SIGN <br />INITIAL GRAVEL PLANT <br />\ V A <br />i LOCATION <br />(SEE DETAIL) <br />w k <br />' EXISTING - - - - - <br />I MINED AREA � \ <br />I SIGN <br />. ..__. ,.:SIGN - <br />- -- BOUNDARY <br />_ <br />EXISTING PERMIT I <br />` 25' SETBAC R 4 <br />� 1 <br />P �� � (� 25' SETBACK / <br />' v � FUTURE ( , \ i` (TrP`) / <br />/ �. <br />, I MINING ARE <br />\ � i <br />PROPERTY BOUNDARY WITH <br />RAND BARBED WIRE <br />PROPOSED PERMIT BOUNDARY •+��. 200 // 3 ST <br />! \ SETBACK / <br />p <br />\ <br />POWER POLES -250' O.C. <br />GRAPHIC SCALE <br />200 0 100 zoo 40D <br />( IN FEET ) <br />1 inch = 200 ff. <br />NOTES: <br />1. MINING WILL PROCEED TO THE SOUTH FROM THE EXISTING MINED <br />AREA. THEN THE WEST HALF OF PERMIT AREA WILL BE MINED. <br />2. CRUSHER AND SCREENING PLANT WILL MOVE ANNUALLY TO <br />CURRENT MINING FACE TO ACCOMMODATE EFFICIENCY. <br />3. MINING FACE WILL BE NEAR VERTICAL. <br />4. MINING FLOOR WILL BE SLOPED DOWN TO THE NORTH SO RUNOFF <br />IS DIRECTED TO STORMWATER BASIN SHOWN ON THIS PLAN. <br />5. STORMWATER BASIN WILL BE INSTALLED IN YEAR 1 OF MINING <br />OPERATION. THE BASIN WILL BE CLEANED PERIODICALLY TO <br />MAINTAIN WATER STORAGE VOLUME. <br />6. FILL DIRT AND SEASONED MANURE WILL BE IMPORTED PERIODICALLY <br />FOR RECLAMATION. THIS MATERIAL MAY BE IMMEDIATELY USED FOR <br />RECLAMATION OR STORED IN THE RECLAMATION MATERIAL <br />STOCKPILE. <br />7. MINING SHALL BE NO CLOSER THAN 200 FEET FROM THE FENCE <br />TO THE SOUTH OF THE PERMIT BOUNDARY. <br />8. TWO EXISTING STOCKPILES ON SITE WILL BE USED FOR <br />RECLAMATION. <br />PREPARED UNDER THE SUPERVISION OF: <br />NAME _y �A� 1— DATE <br />C(// {� <br />TITLE <br />EXHIBIT C -2: MINING PLAN MAP <br />REFERENCES: <br />TOPOGRAPHICAL CONTOURS FROM USGS DEM <br />FOR MANZANOL COLORADO 7.5' QUADRANGLE. <br />LEGEND <br />PROPOSED PERMIT BOUNDARY <br />- - - <br />- EXISTING PERMIT BOUNDARY <br />— - - — - - - <br />- — PROPERTY LINE <br />200' SETBACK <br />MINING BOUNDARY <br />—---- - - ---- <br />DITCH / WATERWAY <br />- <br />-- OVERHEAD UTILITY LINE <br />- <br />- WATER LINE <br />PAVED ROAD <br />-- _._____ <br />UNPAVED ROAD <br />EXISTING INDEX CONTOUR (10') <br />EXISTING INTERMEDIATE CONTOUR (2') <br />EXISTING STRUCTURE <br />RUNOFF FLOW <br />DIRECTION OF MINING <br />NOTES: <br />1. MINING WILL PROCEED TO THE SOUTH FROM THE EXISTING MINED <br />AREA. THEN THE WEST HALF OF PERMIT AREA WILL BE MINED. <br />2. CRUSHER AND SCREENING PLANT WILL MOVE ANNUALLY TO <br />CURRENT MINING FACE TO ACCOMMODATE EFFICIENCY. <br />3. MINING FACE WILL BE NEAR VERTICAL. <br />4. MINING FLOOR WILL BE SLOPED DOWN TO THE NORTH SO RUNOFF <br />IS DIRECTED TO STORMWATER BASIN SHOWN ON THIS PLAN. <br />5. STORMWATER BASIN WILL BE INSTALLED IN YEAR 1 OF MINING <br />OPERATION. THE BASIN WILL BE CLEANED PERIODICALLY TO <br />MAINTAIN WATER STORAGE VOLUME. <br />6. FILL DIRT AND SEASONED MANURE WILL BE IMPORTED PERIODICALLY <br />FOR RECLAMATION. THIS MATERIAL MAY BE IMMEDIATELY USED FOR <br />RECLAMATION OR STORED IN THE RECLAMATION MATERIAL <br />STOCKPILE. <br />7. MINING SHALL BE NO CLOSER THAN 200 FEET FROM THE FENCE <br />TO THE SOUTH OF THE PERMIT BOUNDARY. <br />8. TWO EXISTING STOCKPILES ON SITE WILL BE USED FOR <br />RECLAMATION. <br />PREPARED UNDER THE SUPERVISION OF: <br />NAME _y �A� 1— DATE <br />C(// {� <br />TITLE <br />EXHIBIT C -2: MINING PLAN MAP <br />REFERENCES: <br />TOPOGRAPHICAL CONTOURS FROM USGS DEM <br />FOR MANZANOL COLORADO 7.5' QUADRANGLE. <br />